Empanelled with MoRTH under
Category IV : GeoTechnical Investigation
Afcons Infrastructure Limited
Complete Project

1. Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. elevated station (IIT Kanpur, Kalyanpur Railway Station, SPM Hospital, Kanpur University, Gurudev Chauraha, Geeta Nagar, Rawatpur, LLR Hospital & Motijheel Metro Station) including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. (IIT Kanpur, Kalyanpur Railway Station, SPM Hospital, Kanpur University, Gurudev Chauraha, Geeta Nagar, Rawatpur, LLR Hospital & Motijheel Metro Station) elevated station including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Authority Under Whom Executed
Afcons Infrastructure Ltd,
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

2. Geotechnical Investigation work for the Proposed Metro Alignment from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (via. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj)

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation work for the Proposed Metro Alignment from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (via. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj)

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 3 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

3. Contract KNPCC-02 (R1): Geotechnical Investigation work Proposed Metro Alignment from start of elevated ramp (after Juhi) to end of Naubasta station including Five elevated station (via. Baradevi, Kidwai Nagar, Vasant Vihar, Baudh Nagar, Naubasta).

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Contract KNPCC-02 (R1): Geotechnical Investigation work Proposed Metro Alignment from start of elevated ramp (after Juhi) to end of Naubasta station including Five elevated station (via. Baradevi, Kidwai Nagar, Vasant Vihar, Baudh Nagar, Naubasta).

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 4 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

4. Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.

Project Type: Topographical Survey

Contract Value:

Project Detail
Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 1 Month

Remarks:Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.

5. Soil Investigation work for “AGCC 02: Design and Construction of Tunnel from start of underground ramp (near Fatehabad Road Metro station) to end of ramp after RBS college Metro station including seven underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil Investigation work for “AGCC 02: Design and Construction of Tunnel from start of underground ramp (near Fatehabad Road Metro station) to end of ramp after RBS college Metro station including seven underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

6. Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

7. Geotechnical Investigation work for Proposed UPMRC office building at Lucknow.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation work for Proposed UPMRC office building at Lucknow.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

8. Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

9. Contract DC 05: Geotechnical Investigation work (Including Pressuremeter test, Cross Hole Test, Permeability test in Soil & Rock) Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Contract DC 05: Geotechnical Investigation work (Including Pressuremeter test, Cross Hole Test, Permeability test in Soil & Rock) Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken: Four Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

10. Geotechnical Investigation work for proposed Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of Uttar Pradesh under Bharatmala on EPC Mode.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation work for proposed Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of Uttar Pradesh under Bharatmala on EPC Mode.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken: 2 Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

11. Geotechnical Investigation work for proposed intermediate Pillar (Temporary) between P313 & P314 at the start of ramp of corridor-1 of Kanpur Metro, Kanpur

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation work for proposed intermediate Pillar (Temporary) between P313 & P314 at the start of ramp of corridor-1 of Kanpur Metro, Kanpur

Authority Under Whom Executed
AFCONS Infrastructure Ltd.
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

12. Plate Load Test at BS park for balance work of elevated metro project from IIT K to Motijheel, Kanpur.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Plate Load Test at BS park for balance work of elevated metro project from IIT K to Motijheel, Kanpur.

Authority Under Whom Executed
AFCONS Infrastructure Ltd.
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

Running Project

1. Geotechnical Investigation work for proposed Design and Construction of Twin Tunnel by Shield TBM, Underground Station (Ramganj Chaupar), Cut & Cover Tunnel Box and Underground Ramp from Badi Chaupar Dead end Ch.:10387.860 to Underground Ramp end Ch.:13040 of Jaipur Metro Phase -1C Including Entry Exit Structures, Architectural Finishing, Water Supply, Sanitary Installations and drainage Works at Jaipur, Rajasthan, India

Project Type: Sub-Soil Investigation

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Value Of Work:

Date of Assign the Contract: 25.09.2023

Completion Date: 24.02.2024

Completion Time: 5 Month