1. Project consultancy services for group housing projects at Ambala, Faridabad & Gurgaon under HUDA.

Project Detail
Proposed construction is for 5200 Nos. EWS houses. Project cost Rs. 193 crore.

Authority Under Whom Executed
Gahoi Buildwell Ltd.
701, Marcantile house, 15, K.G. Marg Cannaught Place, New Delhi- 110 001, Ph. 91-11-2370 6183

Time Taken: 6 Months

Remarks:Sub soil exploration, Area survey and Providing services for Architectural, structural design, Electrical, Water supply, sewerage, Fire fighting, storm water drainage, water harvesting and Horticulture for proper completion of project.

2. Geo- Technical Investigation work for development of Korba west thermal power project at Chhatttisgarh state in Korba Distt.

Project Detail
Geo- Technical Investigation work for development of Korba west thermal power project at Chhatttisgarh state in Korba Distt.

Authority Under Whom Executed
M/s. Indu Projects Ltd.
Reg. Office- 1009, 13th. Phase KPHB Colony Hyderabad- 500072

Time Taken: 1.5 Months

Remarks:Boring through soil than rock 150mm dia. Including conducting SPT & collection of disturbed and un- disturbed samples. Boring through rock with NX size drill collecting core and preserving the same. Making trial pits 3 m deep and carrying out visual inspection of slide walls and conducting SPT along with collection of DS, UDS samples.

3. Sub soil exploration work for RCC piers of Metro rail and metro station at Jaipur.

Project Detail
This project is for construction of RCC structure for Metro Rail and a part of additional facility for local transportation at Jaipur.

Authority Under Whom Executed
D.S. Constructions Ltd.
Jaipur Metro Rail Project. H/P: +91-9610096500 E-mail: kuldeep.rathi@dsclimited.com

Time Taken: 3 Month

Remarks: Conducting drilling on over burden soil & on rock with NX size diamond bit with double barrel including collection of DS & UDS samples, all other related work for proper completion of work.

4. Soil Investigation & Area survey work at steel processing unit(SPU) at Jagdishpur (U.P.)

Project Detail
Conversion of existing steel processing plant to rolling mills.

Authority Under Whom Executed
Steel Authority of India Ltd.
Rourkela steel plant, Rourkela-066- 12445604

Time Taken: 3 Month

Remarks:Making test bore of 150 mm dia as per 1892 on all type of soil maintaining necessary driving records and presenting test results in bore log form including taking un- disturbed/ disturbed samples and conducting Standard Penetration Test at various Depth in soil. Drilling through soft or fractured rock (excluding hard roch) at all depth using rotary drilling equipments including recovery of core and provision of core box using TC bitd. Conducting all relevant laboratory test and submission of test report. Conducting Electrical Resistivity Test of soil as per IS 3043- 1987. Conducting Block Vibration Test on samples collected. Conducting California Bearing Resistivity test at proposed area & Area survey.

5. Geo- Technical Investigation of the rocky/ hard strata at shallow patches between Gazipur to Varansi.

Project Detail
Project is to find out engineering characteristic of shallow patches of rock, lying under water for under water blasting to enable the National Water Way-1 to mobilizing the ships through out the year.

Authority Under Whom Executed
Inland Waterway Authority of India, (Ministry of shipping, Govt. Of India)
5th. Floor Biscomaus bhawan west Gandhi Maidan, Patna- 800001 0612- 2230442

Time Taken: 1.5 Month

Remarks:Making test bore of 150 mm dia as per 1892 on shallow patches on main streem of river Ganga at various location including maintaining necessary driving records and presenting test results in bore log form including taking un- disturbed/ disturbed samples and conducting Standard Penetration Test at various Depth in soil.

6. Widening of existing two lanes to four lanes divided carriageway facility including rehabilitation of existing two lane from Km. 208 to 251.7(package 6 ) on Ayodhya - Gorakhpur section of NH- 28 in U.P.

Project Detail
For ground improvement work for fly over at Km. 233 + 726 and for R.O.B at Km. 244 + 200 in packages WB-6, NH- 28.

Authority Under Whom Executed
B.Seenaiah & Company (Projects) Ltd.
Head office: 6-2-913/ 914, 5th. Floor Progressive Towers, Khairtabad Hyderabad- 500 004(A.P.) +91-40-23303663

Time Taken: 2 Month

Remarks:All preliminary testing of soil before and after groung improvement which includes soil properties like atterbergs limits, sieving, specific gravity, permeability shear and consolidation and SPT, DCPT and submission of test report.

7. Sub soil Investigation for determining bearing capacity and their geo- technical properties of soil of works under Dy. Chief Engineer/ Cons. Northern Railway, Rohtak road, Shakurbasti Delhi.

Project Detail
It is proposed project was for ROB across Railway track at Delhi.

Authority Under Whom Executed
Office of Dy. Chief Engineer/ Cons. Northern Rly.
Shakurbasti, Delhi- 56

Time Taken: 1.5 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

8. Geo- Technical Investigation of the project area for construction of 6 MGD New sewage pumping station and laying of gravity sewer etc of Delhi Jal board.

Project Detail
For construction of 6 MGD New sewage pumping station and laying of gravity sewer etc of Delhi Jal board.

Authority Under Whom Executed
AECOM
5th. Floor building No. 10 B, DLF Cyber city, Phase- II Gurgaon, Haryana

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

9. Rehabilitation and up gradation to four laning of Chhapra - Hazipur section of NH- 19 from Km. 188.68 to 209.94 in the state of Bihar under NHDP - III on annuity.

Project Detail
For up- gradation of existing Chhapra - Hazipur National Highway- 19 under NHDP-III.

Authority Under Whom Executed
M/s. Vijay Nirman Company Pvt. Ltd.
Near Gandak bridge, village Anandpura, Hazipur Bihar-

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

10. Geo Technical work for elaborate safe bearing capacity for residential building block.

Project Detail
Contract for work of bore logging at 'D' type & 'C' type quarters area in town ship of KSTPS (1x 500 MW)

Authority Under Whom Executed
NTPC Limited (A Government of India enterprises)
Korba super thermal Power station, Contract services Deptt. PO. Vikas Bhawan Jamnipali Distt. Korba (C.G.)

Time Taken: 15 Days

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

11. Geo Technical work for elaborate safe bearing capacity for residential building block.

Project Detail
Geo Technical work for elaborate safe bearing capacity for residential building block.

Authority Under Whom Executed
Apnesh Properties Limited
12th. Floor, Tower 1 India bulls Finance Centre, Elphinstone Mills Compound, 612- 613, Senapati Marg Mumbai- 400013

Time Taken: 1.5 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

12. Sub soil Investigation for proposed construction of lecture hall at campus.

Project Detail
To facilitate the lector & other similar activity

Authority Under Whom Executed
Indian Institute of Technology, Kanpur.

Time Taken: 1 Month

Remarks:To evaluate engineering characteristic of sub soil and to get safe bearing capacity.

13. Soil Investigation for Children's home at Tis Hahari Metro station.

Project Detail
For extension of Delhi Metro at Tis Hazari area.

Authority Under Whom Executed
Delhi Metro Rail Corporation Ltd.
Site office of Chief Project Manager/ East, speed bed park, opposite Gurudwara, Shakarpur, Delhi- 110 092

Time Taken: 1 Month

Remarks:To evaluate engineering characteristic of sub soil and to get safe bearing capacity.

14. Sub Soil Investigation work for proposed group housing at Laxman Bagh, Kanpur.

Project Detail
To facilitate residence with latest features

Authority Under Whom Executed
M/s. Morning Glory Infra Ltd.
117/ K/ 13, Gutaiya, Kanpur- 24

Time Taken: 2 Month

Remarks:This building is proposed for basement and 23 upper floors. All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

15. Sub Soil Investigation work for proposed REC word HQ building site Gurgaon.(Haryana)

Project Detail
Geo Technical work for elaborate safe bearing capacity for HQ building block.

Authority Under Whom Executed
Telecommunications Consultants India Ltd.
New Delhi-110048

Time Taken: 15 Days

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

16. Soil Investigation work at Police Acadamy site, Rajgir

Project Detail
For proposed construction of 350Kl capacity Over Head Tank.

Authority Under Whom Executed
Engineering Projects(India) Ltd.
50, Chowringhee Road, Kolkata-700071 Ph. 022-824426

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

17. Providing Planning, designing with Architectural designs, drawing including soil exploration etc. In c/with augmentation of capacity from 150 to 175 Locos in electrical Loco shed at Kanpur of ALD Dvn. Of NC Rly

Project Detail
It is proposed project was for 150 to 175 Locos in electrical loco shed.

Authority Under Whom Executed
Dy. Chief Engineering/ Const. North Central Rly,
near Jhakarkati Bus Stand, GT Road Kanpur

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

18. Geotechnical Investigation at Different Location at Barauni Refinery & Barauni Refinery Township.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Indian Oil Corporation Ltd. Engineering Cell-Barauni Refinery
P.O Barauni Oil Refinery Disstt. Begusarai, Bihar. Phone no. 06243-275452-55

Time Taken: 2 Month

Remarks:The work had been carried out to evaluate the engineering characteristic of sub soil to design the safe bearing capacity for up-coming different type of structures ie. Crude Oil Tank, Sub station, town-ship, at various locations. The works include drilling of 900m in depth conducting SPT. Execution of Dynamic Cone Penetration Test at each location. Conducting Plate Load test on 450x450mm size of test plate at 2.0M depth. Collection of samples at 6 location to conduct CBR test.

19. Sub soil Investigation for proposed construction of RCC frame structure for Ground + 3 storied Office cum Residential building at Daryaganj, Delhi.

Project Detail
Geo Technical work for elaborate safe bearing capacity for Office cum Residential building.

Authority Under Whom Executed
LIC of India, Northern Zonal office, Engineering Department
"Jeevan Prakash" 2nd floor, 25-KG Marge New Delhi-110001

Time Taken: 21 Days

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

20. Geo-technical investigation for proposed construction of G+3 storied building at income tax office, civil line Kanpur.

Project Detail
Geo Technical work for elaborate safe bearing capacity for Office building.

Authority Under Whom Executed
Government of india Central Public works Department Kanpur. K.C.S.D.- IV

Time Taken: 21 Days

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

21. Soil Investigation work for installation of Non Recovery - Heat Recovery (NR-HR) type Coke oven Battery at Nandini Mines, Bhilai.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Steel Authority of India Limited. (A Govt. Of India Enterprise) Bhilai Steel Plant Bhilai- 490001 (C

Time Taken: 2 Month

Remarks:Making test bore of 150 mm dia as per 1892 on all type of soil maintaining necessary driving records and presenting test results in bore log form including taking undisturbed/ disturbed samples and conducting Standard Penetration Test at various Depth in soil. Drilling through soft or fractured rock (excluding hard rock) at all depth using rotary drilling equipments including recovery of core and provision of core box using TC bitd. with some special tests like Block Vibration Test. Conducting all relevant laboratory test and submission of test report.

22. Geo tech Investigation for the work of construction of hall of Residence for boys No. XII.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Indian Institute of Technology, Kanpur

Time Taken: 35 Days

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

23. Topographical Survey, Soil Testing and Investigation at NTPC, Unchahar, Raebareli UP.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Bharat Heavy Electricals Limited. (BHEL)
(A Government of india Undertaking) Electronics Division, P.B. No. 2606, Mysore Road, Bangalore-560026

Time Taken: 1.5 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. with some special tests like Conducting Electrical Resistivity Test of soil as per IS 3043- 1987, Field CBR Test, Topographical Survey work.

24. Geo-technical investigation work of 50 Strategic locations along Sewer Alignment at New Delhi.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
M/S. TTI Consulting Engineers (India) Pvt. Ltd.
DJB Pumping Station Complex, opposite Azad Bhawan (In gate), ITO, New Delhi-110002 Ph. No. 011-23378736

Time Taken: 1.5 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

25. Soil Investigation work for proposed ROB at Raebareli to Jaunpur section (Km 0+000 to Km. 166.400) of NH-231.

Project Detail
Geo Technical work for elaborate safe bearing capacity for Proposed ROB.

Authority Under Whom Executed
M/s. Arvind Techno Engineers Pvt.Ltd.
3rd Floor, A-22Green Park (Main), Aurobindo Marg, New Delhi-110016

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

26. Soil Investigation work at 55121.184 M to 57357.623 M of Line 7 Mukundpur - Yamuna Vihar Corridor of Phase- III Delhi MRTS.

Project Detail
This project is for construction of RCC structure for Delhi Metro Rail Corporation. (DMRC)

Authority Under Whom Executed
M/s. Globe Civil Projects Pvt. Ltd.
B-28, Shivalik, New Delhi-110017

Time Taken: 3 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

27. Soil Investigation for the proposed commercial cum Residential Development of 239.64 acre land of CPWD at Ghitorni, New Delhi.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
General Manager (RE),
National Building Construction corporation Limited, New Delhi. 110003

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

28. Soil Investigation for Provision of Industrial BLDG with all Facilities for 155MM Artillery GUN Manufacture at GCF Jabalpur.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Garrison Engineer (I) (P) Fys,
Po: Khamaria, Jabalpur- 482005

Time Taken: 1 Month

Remarks:Making test bore of 150 mm dia Drilling through soft or fractured rock (excluding hard rock) at all depth using rotary drilling equipments including recovery of core and provision of core box using TC bitd. Conducting all relevant laboratory test and submission of test report. Conducting Plate Load test on 450x450mm size of test plate at 2.0M depth.

29. Site Survey, Geo-Technical Investigation& Architectural Service for 4 RSETI's Building at Various Location throughout India.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

30. Site Survey, Geo-Technical Investigation& Architectural Service for RSETI's Building at Various Location throughout India.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633

Time Taken: 1.5 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

31. Site Survey, Geo-Technical Investigation& Architectural Service for RSETI's Building at Various Location throughout India. 32.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633

Time Taken: 1.5 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

32. Geotech Investigation and Survey work in North Town Area at Burnpur IISCO Steel Plant.

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Executive Director (Projects)
PROJECT DEPARTMENT IISCO Steel Plant, Burnpur 713325 (W B)

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Electrical Resistivity Test of soil as per IS 3043- 1987 Topographical Survey work.

33. Soil Investigation work undertaking civil work relating to enhancement of manufacturing facilities at ITARSI.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Military Engineer Service Chief Engineer (Fy) Hyderabad.
Opp. Parade Grounds Sardar Patel Road, Secunderabad-500003

Time Taken: 2.5 Month

Remarks:Making test bore of 150 mm dia Drilling through soft or fractured rock (excluding hard rock) at all depth using rotary drilling equipments including recovery of core and provision of core box using TC bitd. Conducting all relevant laboratory test and submission of test report. Topographical Survey, Field CBR Test.

34. Soil Investigation and testing of safe bearing capacity for proposed 220KV sub Station at Sanjay Gandhi Transport Nagar, Delhi.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
DGM (T) Contract, Delhi Transco Limited,
Rajdhat office, Prefabricated Building, Rajghat New Delhi-110002

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 450x450mm size of test plate at 2.0M depth.

35. Soil Investigation in chunar, Kanpur city, Kanpur Distt, Mirzapur, Varanasi, Varanasi City for proposed pumping station & Sewage Plant.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
Fare Labs Private Ltd.
P-94, Sector-30, Gurgaon-122002, Haryana 0124-4223207-08

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

36. Geo-Technical (SOIL) Investigation & Topographical Survey for 100 bedded MCH Buildings at 5 District Hospital (Shahjahanpur, Muzaffarnagar, Pilibhit, Aligarh & Jaunpur)

Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, Dy.General Manager HSCC (India) Ltd.
E - 6(A), Sector -1, NOIDA, Uttar Pradesh. Pin-201301.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth. Topographical Survey at Various Locations.

37. Soil Investigation work in Kanpur City for Proposed multilevel Parking, Shopping Complex, Terrace Garden at Phoolbagh Kanpur

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, Executive Engineer, Kanpur Development Authority, Kanpur.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

38. Geo-Technical Investigation for the construction of Dr. Ambedkar yojana Group Housing Plot No. 6,7 at Keshavpuram, Kalyanpur Kanpur, U.P.

Project Detail
Geo-Technical work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer U.P. Awas Vikas Parishad, Kalyanpur, Kanpur.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

39. Soil Investigation work for proposed ROB at Raebareli to Jaunpur section (Km 0+000 to Km. 166.400) of NH-231

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
M/s. Arvind Techno Engineers Pvt.Ltd.
3rd Floor, A-22Green Park (Main), Aurobindo Marg, New Delhi-110016 .

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

40. Soil Investigation work for proposed over head tank at various locations Auraiya, Etawah

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer,
Construction Division, U.P. Jal Nigam, Auraiya, Itawa, U.P.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

41. Sub soil investigation to be conducted at various site for proposed Over head Tanks under Rural Drinking water supply scheme at Kannauj.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer,
Construction Division, U.P. Jal Nigam, Kannauj, U.P.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

42. Soil Investigation work at site allocated to Nalanda University, Rajgir, Bihar.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Engineer in Charge
Nalanda University, Rajgir Nalanda Bihar- 803116

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS, UDS & CBR including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

43. Sub Soil Investigation of ROBs in lieu of L-Xings 9139,141,159,163 and 167) on Ambala-Ludhiana Section.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, Dy. Chief Engineer/Const-II,
Northern Railway, Chandigarh.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth.

44. Surveying Along the Proposed Compound wall Alignment of NUPPL- Ghatampur Thermal Power Project- 3x660MW , UP

Project Detail
Surveying Along the Proposed Compound wall Alignment of NUPPL- Ghatampur Thermal Power Project- 3x660MW , UP

Authority Under Whom Executed
To, General Manager/Civil
Neyveli Lignite Cor. Ltd, Neyveli.

Time Taken: 45 Days

Remarks:Surveying along the boundary of Plant area. Surveying along the proposed compound wall and plotting spot levels at intervals of 5M with boundary coordinates etc. RCC Pillars, Brick Pillars.

45. Sub Soil Investigation is as under for construction of residential block Shatabdi Nagar phase-1 (Jawahar puram vistar part-1) Shatabdi Nagar phase-2 (Panki Gangaganj Phase-1) Shatabdi Nagar phase-1 (Jawahar puram vistar part-1) Shatabdi Nagar-4 (Pocket-A) Shatabdi Nagar-4 (Pocket-B)

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer, Kanpur Development Authority Kanpur, U.P.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

46. sub soil investigation to be conducted at various site for proposed Over head Tanks under Rural Drinking water supply scheme at Kannauj.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer, Construction Division, U.P. Jal Nigam, Kannauj, U.P.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

47. sub soil investigation work to be conducted at various locations as per drawing for proposed Lohia Botanical Park near Ganga barrage at Kanpur

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer, Kanpur Development Authority Kanpur, U.P.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth. Conducting Electrical Resistivity Test of soil as per IS 3043- 1987 Topographical Survey work & DCPT Test.

48. sub soil investigation to be conducted at various site for proposed Over head Tanks under Rural Drinking water supply scheme at Kannauj.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer, Construction Division, U.P. Jal Nigam, Kannauj, U.P.
The Executive Engineer, Construction Division, U.P. Jal Nigam, Kannauj, U.P.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

49. Topographical Survey and Soil Testing & Investigation for 50MW PV Solar Project at Kadiri, Anantapur, Dist. Andhra Pradesh.

Project Detail
Topographical Survey and Soil Testing & Investigation for 50MW PV Solar Project at Kadiri, Anantapur, Dist. Andhra Pradesh.

Authority Under Whom Executed
To, The Manager (SC&PV-PVSS), BHEL, Electronics Division, Bangalore-560026
The Manager (SC&PV-PVSS), BHEL, Electronics Division, P.B. No. 2606, Mysore Road Bangalore-560026

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths with some special tests like Topographical Survey Work, Trial Pit, Field CBR Test, ERT Test.

50. Geotechnical Examination In connection with the construction of Hardstand/Road Inside Dock Area, Haldia Dock Complex, Haldia.

Project Detail
Geotechnical Examination In connection with the construction of Hardstand/Road Inside Dock Area, Haldia Dock Complex, Haldia.

Authority Under Whom Executed
To, Manager (I & CF) Kolkata Port Trust, Haldia Dock Complex, Haldia

Time Taken: 3 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting 45 Nos. Plate Load test on 750x750mm size of test plate at 2.0M depth.

51. Sub Soil Investigation for construction of residential block Jawaharpuram Yojana Sector- 6, Sector- 13 & Shatabdi Nagar (Pocket A & B)

Project Detail
Sub Soil Investigation for construction of residential block Jawaharpuram Yojana Sector- 6, Sector- 13 & Shatabdi Nagar (Pocket A & B)

Authority Under Whom Executed
To, The Executive Engineer, Zone-2, Kanpur Development Authority Kanpur, U.P.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

52. Soil Investigation work for proposed ROB at Raebareli to Jaunpur section (Km 0+000 to Km. 166.400) of NH-231

Project Detail
Soil Investigation work for proposed ROB at Raebareli to Jaunpur section (Km 0+000 to Km. 166.400) of NH-231

Authority Under Whom Executed
M/s. Arvind Techno Engineers Pvt.Ltd.
3rd Floor, A-22Green Park (Main), Aurobindo Marg, New Delhi-11

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

53. Soil Investigation and Survey of a land Parcel of DDA at Sanjay Lake Park, Trilokpuri, New Delhi.

Project Detail
Soil Investigation and Survey of a land Parcel of DDA at Sanjay Lake Park, Trilokpuri, New Delhi.

Authority Under Whom Executed
To, Chief General Manager (RE), NBCC Ltd.
1st Floor, NBCC Place, Bhishma Pitamah Marg, New Delhi.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work 195 Acre. DCPT Test.

54. Geotechnical Investigation for Rail based Mass Transit system in Kanpur Metro Rail Corporation Limited. (Uttar Pradesh)

Project Detail
Geotechnical Investigation for Rail based Mass Transit system in Kanpur Metro Rail Corporation Limited. (Uttar Pradesh)

Authority Under Whom Executed
To, Joint General Manager/GT, RITES Ltd,
RITES Bhawan, No. 1, Sector-29, Gurgaon-122001

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Kanpur Metro Rail Corporation Limited. (Uttar Pradesh)

55. Sub Soil Investigation for section AB (KM 15.724) including sampling and testing of materials and preparation of reports, Sampling and testing of existing ground, subgrade soil & material sampling and testing of total length of 43KM of Varanasi Ring Road.

Project Detail
Sub Soil Investigation for section AB (KM 15.724) including sampling and testing of materials and preparation of reports, Sampling and testing of existing ground, subgrade soil & material sampling and testing of total length of 43KM of Varanasi Ring Road.

Authority Under Whom Executed
To, M/s. JACOBS CES, Consulting Engineering Services (India) Pvt. Ltd,
Plot No. 184, Platinum Tower, Udyog Vihar, Phase-1, Gurgaon 122016

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

56. Geotechnical investigations at Chandrabagha bridge of 125 km new Broad Gauge rail link between Rishikesh and Karanprayag in the state of Uttarakhand, India.

Project Detail
Geotechnical investigations at Chandrabagha bridge of 125 km new Broad Gauge rail link between Rishikesh and Karanprayag in the state of Uttarakhand, India.

Authority Under Whom Executed
To, DGM/Project-1, Rail Vikas Nigam Ltd, Rishikesh.-249137
Rail Vikas Nigam Ltd, Rishikesh.-249137

Time Taken: 2 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

57. Geo-Technical(Soil) Investigation For Proposed Construction of STC & O.Q. at Bareilly, O.Q. & Satellite office at Agra and B.O.-3 at SIDCUL, Dehradun.

Project Detail
Geo-Technical(Soil) Investigation For Proposed Construction of STC & O.Q. at Bareilly, O.Q. & Satellite office at Agra and B.O.-3 at SIDCUL, Dehradun.

Authority Under Whom Executed
To, Dy. Chief Engineer (I/C), LIC of India, Engg. Deptt; NCZO, Civil Line, Kanpur

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

58. Topographical and Cross Section and L-Section from Main Road to Sub- Station area and Soil Investigation etc. for land of S/S area at Proposed 220KV S/S Rania.

Project Detail
Topographical and Cross Section and L-Section from Main Road to Sub- Station area and Soil Investigation etc. for land of S/S area at Proposed 220KV S/S Rania.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Kanpur

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

59. Soil Testing for Construction of Residence and Executive Engineer office at 132 K/V S/S Fatehgarh, Distt- Farrukhabad.

Project Detail
Soil Testing for Construction of Residence and Executive Engineer office at 132 K/V S/S Fatehgarh, Distt- Farrukhabad.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Kanpur

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

60. Soil Testing and Contouring at 132 KV S/S Gabhana, Distt- Aligarh.

Project Detail
Soil Testing and Contouring at 132 KV S/S Gabhana, Distt- Aligarh.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Aligarh

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

61. Soil Testing and Contouring at 132 KV S/S Sultanganj, Distt- Mainpuri

Project Detail
Soil Testing and Contouring at 132 KV S/S Sultanganj, Distt- Mainpuri

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Aligarh

Time Taken:

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

62. Soil Testing for Various type of Foundation at 132 KV S/S Nidholi Kalan, Distt- Etah.

Project Detail
Soil Testing for Various type of Foundation at 132 KV S/S Nidholi Kalan, Distt- Etah.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Aligarh

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

63. Soil Investigation & Contour Plan for Construction of 220 KV S/S, Hapur Distt- Hapur.

Project Detail
Soil Investigation & Contour Plan for Construction of 220 KV S/S, Hapur Distt- Hapur.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Ghaziabad.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

64. Soil Testing & Contouring Survey at 132 KV S/S Banda, Shahjahanpur.

Project Detail
Soil Testing & Contouring Survey at 132 KV S/S Banda, Shahjahanpur.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Rampur Bagh, Bareilly.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

65. Soil Testing & Contouring Survey at 132 KV S/S Jalalabad, Shahjahanpur.

Project Detail
Soil Testing & Contouring Survey at 132 KV S/S Jalalabad, Shahjahanpur.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Rampur Bagh, Bareilly.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

66. Soil testing & Contouring Survey at 132 KV S/S Nawabganj, Bareilly.

Project Detail
Soil testing & Contouring Survey at 132 KV S/S Nawabganj, Bareilly.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Rampur Bagh, Bareilly.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

67. Soil Investigation work for Proposed Construction of New Hostel Building at NSI, Kanpur

Project Detail
Soil Investigation work for Proposed Construction of New Hostel Building at NSI, Kanpur

Authority Under Whom Executed
The Executive Engineer, CPWD, Kanpur

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

68. Soil Investigation for Proposed Construction of G+3 Storey Barrack, on two location at ITBP Campus, Maharajpur.

Project Detail
Soil Investigation for Proposed Construction of G+3 Storey Barrack, on two location at ITBP Campus, Maharajpur.

Authority Under Whom Executed
The Executive Engineer, CPWD, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

69. Soil Investigation (2nd Phase) for Proposed Construction of G+3 Storey Barrack, at ITBP Campus, Maharajpur.

Project Detail
Soil Investigation (2nd Phase) for Proposed Construction of G+3 Storey Barrack, at ITBP Campus, Maharajpur.

Authority Under Whom Executed
The Executive Engineer, CPWD, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

70. Soil Investigation work at O.F. Itarsi.

Project Detail
Soil Investigation work at O.F. Itarsi.

Authority Under Whom Executed
Garrison Engineers (I) (P) Fys.
Po: Khamaria Jabalpur-482005

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

71. Soil Investigation work of 5 Lakh Gallon OHT at Kanpur.

Project Detail
Soil Investigation work of 5 Lakh Gallon OHT at Kanpur.

Authority Under Whom Executed
Garrison Engineers (I) (P) Fys. Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

72. Soil Investigation of Bank Plot No. 86/241 at Raipurwa Kanpur

Project Detail
Soil Investigation of Bank Plot No. 86/241 at Raipurwa Kanpur

Authority Under Whom Executed
The Chief Manager, Allahabad Bank,
Zonal office, 113/58, Swaroop Nagar, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

73. Soil Investigation work for Construction of Block at National Physical Laboratory, New Delhi.

Project Detail
Soil Investigation work for Construction of Block at National Physical Laboratory, New Delhi.

Authority Under Whom Executed
Dy. General Manager (MMD-Contract)
Engineering Projects (India) Ltd, Scope Complex, 7, Lodhi Road, New delhi.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

74. Geotechnical Investigation work at Natural Draught Cooling Tower CGPGCL, Korba West Korba. (C.G.)

Project Detail
Geotechnical Investigation work at Natural Draught Cooling Tower CGPGCL, Korba West Korba. (C.G.)

Authority Under Whom Executed
Gammon India Limited,
Gammon House, Veer Savarkar Marg, Prabhadevi, Mumbai.

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

75. Soil Investigation work for Proposed office Building at Fazalganj, Kanpur

Project Detail
Soil Investigation work for Proposed office Building at Fazalganj, Kanpur

Authority Under Whom Executed
RSPL Limited, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

76. Soil Investigation work for Proposed Construction of 17th Story Highrise Building at Indranagar, Kanpur

Project Detail
Soil Investigation work for Proposed Construction of 17th Story Highrise Building at Indranagar, Kanpur

Authority Under Whom Executed
Diviniti Homes Pvt. Ltd., Civil Lines, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

77. Soil Investigation work for Proposed Building Block at Kanpur Medical college, Kanpur.

Project Detail
Soil Investigation work for Proposed Building Block at Kanpur Medical college, Kanpur.

Authority Under Whom Executed
The Executive Engineer, PWD, Kanpur

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

78. Soil Investigation work for proposed over head tank at various locations Auraiya, Etawah

Project Detail
Soil Investigation work for proposed over head tank at various locations Auraiya, Etawah

Authority Under Whom Executed
To, The Executive Engineer,
Construction Division, U.P. Jal Nigam, Auraiya, Itawa, U.P.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

79. Soil Investigation work for proposed over head tank at various locations Etah.

Project Detail
Soil Investigation work for proposed over head tank at various locations Etah.

Authority Under Whom Executed
To, The Executive Engineer,
Construction Division, U.P. Jal Nigam, Etah.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

80. sub soil investigation to be conducted at various site for proposed Over head Tanks under Rural Drinking water supply scheme at Kannauj.

Project Detail
sub soil investigation to be conducted at various site as mentioned below for proposed Over head Tanks under Rural Drinking water supply scheme at Kannauj.

Authority Under Whom Executed
To, The Executive Engineer,
Construction Division, U.P. Jal Nigam, Kannauj, U.P.

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

81. Soil Investigation work for proposed over head tank at various locations Lakhimpur.

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, The Executive Engineer,
Construction Division, U.P. Jal Nigam, Lakhimpur.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

82. Soil testing & Contouring Survey at 132 KV S/S Nawabganj, Bareilly.

Project Detail
Soil testing & Contouring Survey at 132 KV S/S Nawabganj, Bareilly.

Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Rampur Bagh, Bareilly.

Time Taken: 1 Month

Remarks:Topographical survey including preparation of cross section and longitudinal section and other relevant details

83. soil investigation work to be conducted at various locations for proposed Kanpur Modern City Project Kanpur.

Project Detail
soil investigation work to be conducted at various locations for proposed Kanpur Modern City Project Kanpur.

Authority Under Whom Executed
To, The Executive Engineer,
Kanpur Development Authority, Kanpur U.P.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Dynamic Cone Penetration test (DCPT) according to IS Code-4968 pt. II

84. Geo-Technical (SOIL) Investigation & Topographical Survey for 100 bedded MCH Buildings at Etah.

Project Detail
Geo-Technical (SOIL) Investigation & Topographical Survey for 100 bedded MCH Buildings at Etah.

Authority Under Whom Executed
To, Dy.General Manager,
HSCC (India) Ltd. E 6(A), Sector -1, NOIDA, Uttar Pradesh. Pin-201301.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth. Topographical Survey at Various Locations.

85. Sub Soil Investigation, Plate Load Test, design and drawing of bridge for Road over Bridge in lieu of Level crossing Nos. 5-C, 11-C & 16-C on Meerut Khurja section & for 45 numbers Road Under Bridge on Meerut Khurja section.

Project Detail
Sub Soil Investigation, Plate Load Test, design and drawing of bridge for Road over Bridge in lieu of Level crossing Nos. 5-C, 11-C & 16-C on Meerut Khurja section & for 45 numbers Road Under Bridge on Meerut Khurja section.

Authority Under Whom Executed
To, Dy. Chief Engineer/Const, NDWCS, Northern Railway, New Delhi.

Time Taken: 6 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. design and drawing of bridge for Road over Bridge in lieu of Level crossing Nos. 5-C, 11-C & 16-C on Meerut Khurja section & for 45 numbers Road Under Bridge on Meerut Khurja section.

86. Geo technical Investigation at different location for BS-IV Project at Barauni Refinery.

Project Detail
Geo technical Investigation at different location for BS-IV Project at Barauni Refinery.

Authority Under Whom Executed
To, The Manager (Contracts) Indian Oil Corporation. Ltd,
Barauni Refinery, P.O.: Barauni Refinery, Bagusarai, Bihar-851114 Ph. No. 06243-240183-86

Time Taken: 1.5 Month's

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Static Cone Penetration Tests at various locations, Dynamic Cone Penetration Tests at various locations, Plate Load Tests at various locations, Vane shear test at different locations, Cross Hole Shear Wave Test as per IS:13372 (1992)

87. Topographical Survey and Geotechnical Investigation work at Budge Budge Bottling Plant, West Bengal

Project Detail
Topographical Survey and Geotechnical Investigation work at Budge Budge Bottling Plant, West Bengal

Authority Under Whom Executed
To, Dy. General Manager (LPG) I/C, Indian Oil Cor. Ltd., West Bengal State Office.

Time Taken: 1.5 Month's

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work.

88. Topographical Survey and Soil Sampling Work for evaluation of Carbon Slurry at NFL, Bhatinda & Nangal.

Project Detail
Topographical Survey and Soil Sampling Work for evaluation of Carbon Slurry at NFL, Bhatinda & Nangal.

Authority Under Whom Executed
To, The Addl. General Manager (MM), PDIL, Noida.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Works.

89. Geo-technical investigation for National Highway project in stretch of Shahkot to Moga of aprox. 54KM in state of Punjab.

Project Detail
Geo-technical investigation for National Highway project in stretch of Shahkot to Moga of aprox. 54KM in state of Punjab.

Authority Under Whom Executed
To, M/s. Infinite Civil Solutions Pvt. Ltd., Ahmedabad.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

90. Soil Investigation for Proposed DFCC project under Kanpur-Gaziabad section, U.P.

Project Detail
Soil Investigation for Proposed DFCC project under Kanpur-Gaziabad section, U.P.

Authority Under Whom Executed
To, M/s. TATA-ALDESA (JV), DFCCIL, LOT 101. MAITHA.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

91. Soil Investigation for Proposed DFCC project under Kanpur-Gaziabad section, U.P.

Project Detail
Soil Investigation for Proposed DFCC project under Kanpur-Gaziabad section, U.P.

Authority Under Whom Executed
To, M/s. TATA-ALDESA (JV), DFCCIL, LOT 101. MAITHA.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

92. Soil Investigation for Proposed DFCC project under Kanpur-Gaziabad section, U.P.

Project Detail
Soil Investigation for Proposed DFCC project under Kanpur-Gaziabad section, U.P.

Authority Under Whom Executed
To, M/s. TATA-ALDESA (JV), DFCCIL, LOT 101. MAITHA.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

93. Geo-technical investigation for widening Up gradation to 2 Lane of NH 301 (Kargil Zanskar Road) in the state of Jammu and Kashmir

Project Detail
Geo-technical investigation for widening Up gradation to 2 Lane of NH 301 (Kargil Zanskar Road) in the state of Jammu and Kashmir

Authority Under Whom Executed
To, M/s. Feedback Infra Pvt. Ltd.,
15th, Floor Tower 9B, DLF Cyber City, Gurgaon- 122 002.

Time Taken: 2 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

94. Soil Investigation work for Proposed 220 KV S/S at Sarh, Kanpur

Project Detail
Soil Investigation work for Proposed 220 KV S/S at Sarh, Kanpur

Authority Under Whom Executed
To, The Executive Engineer
Electricity Civil Transmission Division, Kanpur.

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

95. Soil Investigation work for Proposed 938 Nos. Family quarters at GC, CRPF, Amethi

Project Detail
Soil Investigation work for Proposed 938 Nos. Family quarters at GC, CRPF, Amethi

Authority Under Whom Executed
The Executive Engineer
Kanpur Central Division, CPWD, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

96. Geotechnical Investigation for preparation of feasibility report for two lanes from Kohima to Nagaland/Manipur border Section of NH-150 in Nagaland.

Project Detail
Geotechnical Investigation for preparation of feasibility report for two lanes from Kohima to Nagaland/Manipur border Section of NH-150 in Nagaland.

Authority Under Whom Executed
To, M/s. Feedback Infra Pvt. Ltd.,
15th, Floor Tower 9B, DLF Cyber City, Gurgaon- 122 002.

Time Taken: 2 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

97. Geotechnical Investigation works for the Proposed New POL Terminal at Asanur, Villupram District, Tamilnadu.

Project Detail
Geotechnical Investigation works for the Proposed New POL Terminal at Asanur, Villupram District, Tamilnadu.

Authority Under Whom Executed
To, Chief Project Manager, Chennai Terminal & Lube Project,
Indian Oil Corporation Limited,139, Nungambakkam High Road, Chennai-600034

Time Taken: 3 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. ERT Test & CBR Test.

98. Topographical Survey and Soil Testing & Investigation for 10MW Solar Photovoltaic Power Plant at Mejia, West Bengal. (WBSEDCL)

Project Detail
Topographical Survey and Soil Testing & Investigation for 10MW Solar Photovoltaic Power Plant at Mejia, West Bengal. (WBSEDCL)

Authority Under Whom Executed
To, The Sr. Manager (SC&PV-PVSS),
BHEL, Electronics Division, Bangalore-560026

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work, CBR Test, ERT Test.

99. Topographical Survey and Soil Testing & Investigation for 10MW Solar Photovoltaic Power Plant at Chharrah, West Bengal. (WBSEDCL)

Project Detail
Topographical Survey and Soil Testing & Investigation for 10MW Solar Photovoltaic Power Plant at Chharrah, West Bengal. (WBSEDCL)

Authority Under Whom Executed
To, Sr. Manager/SC&PV-PVSS
BHEL, Electronics Division, Bangalore-560026

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work, CBR Test, ERT Test.

100. Geotechnical Investigation for Ambala-Kaithal project, NH-65 from Km 0.000 to Km 50.860

Project Detail
Geotechnical Investigation for Ambala-Kaithal project, NH-65 from Km 0.000 to Km 50.860

Authority Under Whom Executed
M/s. Infinite Civil Solutions Pvt. Ltd.,
F.P.-25, Near Aditya Elegance & Railway Track, CIMS Hospital Road,Sola, Ahmedabad.

Time Taken: 3 Months

Remarks:Geotechnical Investigation for Ambala-Kaithal project, NH-65 from Km 0.000 to Km 50.860

101. Geotechnical Investigation work for Important bridges for Four Laning of Nagina to Kashipur Section of NH 74 from Km. 73.00 to Km. 175.00 in the state of UP and Uttarakhand under NHDP Phase IV

Project Detail
Geotechnical Investigation work for Important bridges for Four Laning of Nagina to Kashipur Section of NH 74 from Km. 73.00 to Km. 175.00 in the state of UP and Uttarakhand under NHDP Phase IV

Authority Under Whom Executed
To, M/s. PNC Infratech Limited
PNC Tower, 3/22-D, Civil Line Bypass Road, NH-2, Agra-282002

Time Taken: 3 Months

Remarks: Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

102. Geotechnical Investigation for 10 MWp Solar P.V Plant at BHEL Bhopal

Project Detail
Geotechnical Investigation for 10 MWp Solar P.V Plant at BHEL Bhopal

Authority Under Whom Executed
To, DGM (TCL-PLG.) BHARAT HEAVY ELECTRICALS LIMITED
Hostel No. 4, Piplani, BHEL, Bhopal Ph no: - 2503215, 2502794, 2505844

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. ERT Test.

103. Geotechnical investigation and other ancillary works in connection with doubling of track from Rajpura to Bathinda in Northern Railway.

Project Detail
Geotechnical investigation and other ancillary works in connection with doubling of track from Rajpura to Bathinda in Northern Railway.

Authority Under Whom Executed
To, Dy. Chief Engineer/Const.,
Northern Railway, Ambala Cantt.

Time Taken: 6 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

104. Conducting geotechnical explorations for the locations of bridges, LHS, deep cutting etc. between km 979 to 1063 for 3rd line between Bina-Katni section

Project Detail
Conducting geotechnical explorations for the locations of bridges, LHS, deep cutting etc. between km 979 to 1063 for 3rd line between Bina-Katni section

Authority Under Whom Executed
To, Dy. Chief Engineer-II (Const)
Construction Complex, Habibganj Station (East) West Central Railway, Bhopal-462024

Time Taken: 4 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Plate Load Tests, Vane shear Tests, CBR Test.

105. Geotechnical Investigation work for Granulated Single Super Phosphate Project at FAGMIL, Chittorgarh (Raj.)

Project Detail
Geotechnical Investigation work for Granulated Single Super Phosphate Project at FAGMIL, Chittorgarh (Raj.)

Authority Under Whom Executed
To, Addl, GM (MM),
Projects & Development India Limited, A-14, Sector-1, Noida-201301

Time Taken: 1 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Plate Load Tests,

106. Topographical, Geotechnical & Hydro-geological survey work for setting up of New AIIMS at Gorakhpur. (U.P.)

Project Detail
Topographical, Geotechnical & Hydro-geological survey work for setting up of New AIIMS at Gorakhpur. (U.P.)

Authority Under Whom Executed
To, DGM (Project), HSCC (India) Ltd,
E-6(A), Sector-1, Noida-201301 (U.P.)

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth, Static cone penetration test up to 10.0 m, Dynamic cone penetration test up to 10.0m, Field density test at 1.5m, 2.5m and 3.5m depth, Soil resistivity test as per IS 3043, Ground water investigation by Geo-physical equipments for assessment of availability of ground water at site, design for Rain water Harvesting System.

107. Geo Technical Investigation Work For The Proposed Lingaraj Silo Connectivity With NTPC captive Line At Talcher coalfields

Project Detail
Geo Technical Investigation Work For The Proposed Lingaraj Silo Connectivity With NTPC captive Line At Talcher coalfields

Authority Under Whom Executed
To, Jt. General Manager, RITES Ltd;
Bhagwan Tower, 1st’ Floor, Block-A, Cuttack Road, Bhubaneswar- 751 006

Time Taken: 3 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

108. Soil Investigation, Contour Survey & Levelling works at 220 K.V. S/S Madhuban Bapudham Ghaziabad.

Project Detail
Soil Investigation, Contour Survey & Levelling works at 220 K.V. S/S Madhuban Bapudham Ghaziabad.

Authority Under Whom Executed
The Executive Engineer, UPPTCL
Electricity Civil Transmission Division, UPPTCL, Kavinagar, Ghaziabad.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work

109. Soil Testing, Land Survey Contouring & Traversing etc, work at 132 KV S/S Jalalpur (Banat) Distt. Shamli.

Project Detail
Soil Testing, Land Survey Contouring & Traversing etc, work at 132 KV S/S Jalalpur (Banat) Distt. Shamli.

Authority Under Whom Executed
To, The Executive Engineer,
Uttar Pradesh Power Transmission Corp. Ltd, Electrical Civil Transmission Division, 132, KV S/S Bopa Road, Muzaffarnagar.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work

110. Soil Testing, Land Survey Contouring & Traversing etc, work at 132 KV S/S Ambala Road-II, Distt. Saharanpur.

Project Detail
Soil Testing, Land Survey Contouring & Traversing etc, work at 132 KV S/S Ambala Road-II, Distt. Saharanpur.

Authority Under Whom Executed
To, The Executive Engineer,
Uttar Pradesh Power Transmission Corp. Ltd, Electrical Civil Transmission Division, 132, KV S/S Bopa Road, Muzaffarnagar.

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work.

111. Soil Testing, Land Survey Contouring & Traversing etc, work at 132 KV S/S Sarsawa Distt. Saharanpur.

Project Detail
Soil Testing, Land Survey Contouring & Traversing etc, work at 132 KV S/S Sarsawa Distt. Saharanpur.

Authority Under Whom Executed
To, The Executive Engineer,
Uttar Pradesh Power Transmission Corp. Ltd, Electrical Civil Transmission Division, 132, KV S/S Bopa Road, Muzaffarnagar.

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work.

112. Testing and Contouring at 132 KV S/S Sahaswan, Budaun.

Project Detail
Testing and Contouring at 132 KV S/S Sahaswan, Budaun.

Authority Under Whom Executed
To, The Executive Engineer,
Electricity Civil Transmission Division, Hydel Colony, Rampur Bagh, Bareilly.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work.

113. Topography and cross section and L-section from main road to sub-station area and topography & contouring and soil investigation etc. for land of S/S area at proposed 132KV S/S Talgram, Distt, Kannauj.

Project Detail
Topography and cross section and L-section from main road to sub-station area and topography & contouring and soil investigation etc. for land of S/S area at proposed 132KV S/S Talgram, Distt, Kannauj.

Authority Under Whom Executed
To, The Executive Engineer,
Electricity Civil Transmission Division, Kanpur.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work.

114. Geo-technical Investigation work for proposed construction of Ground plus Three storied, Type-A & B, Residential Quarters at Police Line, Orai, Jalaun.

Project Detail
Geo-technical Investigation work for proposed construction of Ground plus Three storied, Type-A & B, Residential Quarters at Police Line, Orai, Jalaun.

Authority Under Whom Executed
To, The Executive Engineer,
U.P. Police Avas Vikas Nigam Ltd. Orai, Jalaun, U.P.

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

115. soil investigation with bore logs, soil testing etc. for construction of ROB’s in lieu of LC No.42/B/Spl at Km.365/11-13 between JPL-HDN in BD section under AEN/JPL.

Project Detail
soil investigation with bore logs, soil testing etc. for construction of ROB’s in lieu of LC No.42/B/Spl at Km.365/11-13 between JPL-HDN in BD section under AEN/JPL.

Authority Under Whom Executed
To, Divisional Engineer (III)
East Central Railway, Mughalsarai.

Time Taken: 3 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Plate Load Tests.

116. Geo-technical Investigation works for New Units of BS-IV Project at Barauni Refinery of Indian Oil Corporation Limited.

Project Detail
Geo-technical Investigation works for New Units of BS-IV Project at Barauni Refinery of Indian Oil Corporation Limited.

Authority Under Whom Executed
To, The Chief Manager (Contract)
Indian Oil Corporation Limited, Refineries Division, Scope Complex, Core-2, 7, Industrial Area, Lodhi Road, New Delhi-110003

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Static Cone Penetration Tests at various locations, Dynamic Cone Penetration Tests at various locations, Plate Load Tests at various locations, Vane shear test at different locations, Cross Hole Shear Wave Test as per IS:13372 (1992)

117. Geotechnical Investigation pertaining to associated civil works for retrofitting of ESPs of unit#1,2,3 & 4 (4X210MW) of Hasdeo TPS, Korba West for CSPGCL, Chhattisgarh.

Project Detail
Geotechnical Investigation pertaining to associated civil works for retrofitting of ESPs of unit#1,2,3 & 4 (4X210MW) of Hasdeo TPS, Korba West for CSPGCL, Chhattisgarh.

Authority Under Whom Executed
To, The Sr. Engineer (WC)/RMSG,
Block-7 Annexe, Ground Floor, Central Wing, BHEL, Piplani, Bhopal – 462022

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

118. Geotechnical Investigation work for preparation of DPR for Metro Corridor from Haridwar to Rishikesh

Project Detail
Geotechnical Investigation work for preparation of DPR for Metro Corridor from Haridwar to Rishikesh.

Authority Under Whom Executed
To, The Sr. Addl. General Manager (Consultancy)
25, Ashoka Road, New Delhi-110001

Time Taken: 2 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

119. Geotechnical Investigation work for preparation of ‘Detailed Project Report (DPR) for removing bottleneck points of Kona Expressway by constructing new ROB/RUB, flyovers and integrated Traffic Circulation Plan for Santragachi railway Station and Santragachi Bus Terminus from Kona Expressway

Project Detail
Geotechnical Investigation work for preparation of ‘Detailed Project Report (DPR) for removing bottleneck points of Kona Expressway by constructing new ROB/RUB, flyovers and integrated Traffic Circulation Plan for Santragachi railway Station and Santragachi Bus Terminus from Kona Expressway.

Authority Under Whom Executed
To, The DGM (HW)
RITES Ltd, Highway Division, Kolkata Metro Railway Service Building, (4th Floor)56, C.R. Avenue, Kolkata-700012

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

120. Geo Technical Investigation and recommendation of Bridge foundation type for the Major Railway Bridges in between Bina-Jhansi.

Project Detail
Geo Technical Investigation and recommendation of Bridge foundation type for the Major Railway Bridges in between Bina-Jhansi.

Authority Under Whom Executed
To, The Director,
Kristi Engineering Services Pvt. Ltd. Reg Office: 2nd Floor, Divine Palace, Bimal Sinha Sarani, Hakimpara, Siliguri-734001

Time Taken: 2 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

121. Topographical survey and Soil Investigation for 5.04 MW Solar Photovoltaic Power plant at Berradol Tehsil Shri Naina devi ji District- Bilaspur, Himachal Pradesh.

Project Detail
Topographical survey and Soil Investigation for 5.04 MW Solar Photovoltaic Power plant at Berradol Tehsil Shri Naina devi ji District- Bilaspur, Himachal Pradesh.

Authority Under Whom Executed
To, The Dy. Manager/SC&PV-Engineering
Electronics Division, Bangalore-560026

Time Taken: 4 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work, CBR Test, ERT Test.

122. Geotechnical Investigation & Topographical Survey work for 50 bedded MCH Buildings at Khatauli, Kakori, Gosaiganj, Bhangel under NRHM U.P

Project Detail
Geotechnical Investigation & Topographical Survey work for 50 bedded MCH Buildings at Khatauli, Kakori, Gosaiganj, Bhangel under NRHM U.P

Authority Under Whom Executed
To, DGM (Project), HSCC (India) Ltd,
E-6(A), Sector-1, Noida-201301 (U.P.)

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey at Various Locations.

123. Geo-Technical Investigation in Proposed Viaduct & ROB locations in connection with the work of PMC Services for Development of New Railway Siding Near Gua Railway Station, Gua Iron Mines of SAIL, RMD Dist. West Singbhum, Jharkhand.

Project Detail
Geo-Technical Investigation in Proposed Viaduct & ROB locations in connection with the work of PMC Services for Development of New Railway Siding Near Gua Railway Station, Gua Iron Mines of SAIL, RMD Dist. West Singbhum, Jharkhand.

Authority Under Whom Executed
To The Joint General Manager/GT,
RITES Limited, RITES Bhawan No. 1, Sector-29, Gurgaon, Haryana

Time Taken: 2 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131. Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

124. Geo-Technical Investigation for the work for 9 ROB's of Bhaupur-Khurja Section of EDFC.

Project Detail
Geo-Technical Investigation for the work for 9 ROB's of Bhaupur-Khurja Section of EDFC.

Authority Under Whom Executed
To The Joint General Manager/GT,
RITES Limited, RITES Bhawan No. 1, Sector-29, Gurgaon, Haryana

Time Taken: 3 Month

Remarks:Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

125. Geo Technical Investigation work for proposed Group housing at Kanpur.

Project Detail
Geo Technical Investigation work for proposed Group housing at Kanpur.

Authority Under Whom Executed
J. k. Cotton Ltd.
Kamla Tower, Kanpur.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

126. Soil Investigation work for Proposed Building at IIT Campus, Kanpur.

Project Detail
Soil Investigation work for Proposed Building at IIT Campus, Kanpur.

Authority Under Whom Executed
Superintending Engineer
IIT, Kanpur.

Time Taken: 50 Days

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

127. Geo-technical Investigation Work For preparation of Detailed Project Report from Raidurg, Gachibowli to Hyderabad Airport (Airport Express Line) (Total length- 30.7 Km Approx.)

Project Detail
Geo-technical Investigation Work For preparation of Detailed Project Report from Raidurg, Gachibowli to Hyderabad Airport (Airport Express Line) (Total length- 30.7 Km Approx.)

Authority Under Whom Executed
JGM (Consultancy)
Delhi Metro Rail Corporation Ltd, 25, Ashoka Road, New Delhi

Time Taken: 60 Days

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

128. Geo-Technical Investigation work for Preparation of Detailed Project Report of Metro Extension from (i) BHEL to Lakdi-ka-Pul (via Gachibowli with Connection to Miyapur) (ii) Nagole to L.B. Nagar (Total length- 30 Km Approx.)

Project Detail
Geo-Technical Investigation work for Preparation of Detailed Project Report of Metro Extension from (i) BHEL to Lakdi-ka-Pul (via Gachibowli with Connection to Miyapur) (ii) Nagole to L.B. Nagar (Total length- 30 Km Approx.)

Authority Under Whom Executed
JGM (Consultancy)
Delhi Metro Rail Corporation Ltd, 25, Ashoka Road, New Delhi

Time Taken: 60 Days

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

129. Geo-Technical Investigation for the work for 5 ROB's on Khurja - Dadri Section of EDFC.

Project Detail
Geo-Technical Investigation for the work for 5 ROB's on Khurja - Dadri Section of EDFC.

Authority Under Whom Executed
Joint General Manager/GT,
RITES Limited, RITES Bhawan No. 1, Sector-29, Gurgaon, Haryana

Time Taken: 60 Days

Remarks: Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

130. Geotechnical Investigation work in different location of Bridges and deep cutting of formation for setting up Rail Infrastructure work of proposed siding of Amrapali OCP of CCP Jharkhand.

Project Detail
Geotechnical Investigation work in different location of Bridges and deep cutting of formation for setting up Rail Infrastructure work of proposed siding of Amrapali OCP of CCP Jharkhand.

Authority Under Whom Executed
GM (Projects)
RITES Limited, Regional Project office, 2nd Floor, Metro Railway Service Building, 56, C.R. Avenue, Kolkata-700 012

Time Taken: 90 Days

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

131. Geotechnical Investigation and topographical survey for 2X17.5 TPH Heat Recovery Steam Generators (HRSGs) at GAIL Vijaipur Compressor Station, Vijaipur, M.P.

Project Detail
Geotechnical Investigation and topographical survey for 2X17.5 TPH Heat Recovery Steam Generators (HRSGs) at GAIL Vijaipur Compressor Station, Vijaipur, M.P.

Authority Under Whom Executed
Sr. DGM, Deptt: SCT,
Bharat Heavy Elecrticals Limited, PSNR, Plot No. 25, Sector-16A, Noida-201 301

Time Taken: 60 Days

Remarks: Drilling of NX/NQ size borehole in Soil and rock strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

132. Geotechnical Investigation for extension of corridor from Gurgaon railway station to old Delhi road near sector-22

Project Detail
Geotechnical Investigation for extension of corridor from Gurgaon railway station to old Delhi road near sector-22

Authority Under Whom Executed
Dy. General Manager /GT,
RITES Ltd, RITES Bhawan, Plot No. 01, Sector-29, Gurgaon, Haryana-122001

Time Taken: 30 Days

Remarks: Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

133. Geotechnical/Sub Soil Investigation for the Development of vacant plot at LICI Building CBO-3 at Raipur, (CG).

Project Detail
Geotechnical/Sub Soil Investigation for the Development of vacant plot at LICI Building CBO-3 at Raipur, (CG).

Authority Under Whom Executed
Chief Engineer,
Engineering Dept. LIC of India, Central Zonal Office, 3rd Floor, Jeevan Shiha , 60-B Hosangabad Road Bhopal -462011

Time Taken: 60 Days

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

134. Soil Investigation & Topographical Survey work for Proposed 150 MW Solar Power Project at Pavagada, Karnataka.

Project Detail
Soil Investigation & Topographical Survey work for Proposed 150 MW Solar Power Project at Pavagada, Karnataka.

Authority Under Whom Executed
Avaada Solarise Energy Pvt Ltd
3rd Floor, PTI Building, Parliament Street, New Delhi.

Time Taken: 2 Month

Remarks:Drilling of NX/NQ size borehole in Soil and rock strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work.

135. Soil Investigation work for Proposed 5 MW Solar Power Project at Kanpur.

Project Detail
Soil Investigation work for Proposed 5 MW Solar Power Project at Kanpur.

Authority Under Whom Executed
Avaada Solarise Energy Pvt Ltd
3rd Floor, PTI Building, Parliament Street, New Delhi

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

136. Geotechnical Investigation and Topographical Survey work for proposed Office Block at Power Grid, Lucknow

Project Detail

Authority Under Whom Executed
HSCC India Limited
E-6 (A), Sector-1, Noida

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth. Topographical Survey Work.

137. Soil Investigation and Topographical Survey work for Proposed RO at Barbai, Mahoba.

Project Detail
Soil Investigation and Topographical Survey work for Proposed RO at Barbai, Mahoba.

Authority Under Whom Executed
Indian Oil Corporation Limited
Kalpi Road, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth. Topographical Survey Work.

138. Soil Investigation and Topographical Survey work for proposed Depot under UPSO-1 at Jhansi.

Project Detail
Soil Investigation and Topographical Survey work for proposed Depot under UPSO-1 at Jhansi.

Authority Under Whom Executed
Indian Oil Corporation Limited
Indian Oil Bhavan, Kapurthala Complex Sector-F, Aligang, Lucknow.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth. ERT & Field CBR Test. Topographical Survey Work.

139. Soil Investigation & Topographical Survey work for Proposed Ethanol Tank at Lucknow Terminal.

Project Detail
Soil Investigation & Topographical Survey work for Proposed Ethanol Tank at Lucknow Terminal.

Authority Under Whom Executed
Indian Oil Corporation Limited
Indian Oil Bhavan, Kapurthala Complex Sector-F, Aligang, Lucknow.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth. ERT & Plate Load Test. Topographical Survey Work.

140. Soil Investigation and Topographical Survey work for Proposed RO at Ramaipur, Kanpur.

Project Detail
Soil Investigation and Topographical Survey work for Proposed RO at Ramaipur, Kanpur.

Authority Under Whom Executed
Indian Oil Corporation Limited
Kalpi Road, Kanpur

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth. Topographical Survey Work.

141. Geotechnical Investigation for NUPPL Siding at Ghatampur with takeoff from Hamirpur Road Railway Station.

Project Detail
Geotechnical Investigation for NUPPL Siding at Ghatampur with takeoff from Hamirpur Road Railway Station.

Authority Under Whom Executed
RITES Limited
RITES Bhawan, No. 1, Sector-29, Gurgaon, Haryana.

Time Taken: 1 Month

Remarks: Drilling of PX size borehole in all types of Soils. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

142. Topographical Survey work for proposed 200 MW Solar Power Plant (Pavagada Solar Park) at Karnataka- Block B23 to B26)

Project Detail
Topographical Survey work for proposed 200 MW Solar Power Plant (Pavagada Solar Park) at Karnataka- Block B23 to B26)

Authority Under Whom Executed
SBG Cleantech Project Co Five Pvt. Ltd.
Block No. B23 to B26, 2000MW Pavagada Solar Park Phase II, Taluk, Pavagada, Distt-Tumkur, Karnataka.

Time Taken: 3 Month

Remarks:Topographical Survey work, Construction of BM and Boundary Pillars.

143. Soil Investigation work for Proposed 200 MW Solar Power Plant (Pavagada Solar Park) at Karnataka- Block B23 to B26)

Project Detail
Soil Investigation work for Proposed 200 MW Solar Power Plant (Pavagada Solar Park) at Karnataka- Block B23 to B26)

Authority Under Whom Executed
SBG Cleantech Project Co Five Pvt. Ltd.
Block No. B23 to B26, 2000 MW Pavagada Solar Park Phase II, Taluk, Pavagada, Distt-Tumkur, Karnataka.

Time Taken: 3 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Electrical Resistivity Test. Thermal Resistivity Test. Pile pull out and lateral load test (including casting of reaction pile) to assess pile resistance to uplift and lateral resistance.

144. Topographical Contour survey at Ayana, 250 MW solar Power Plant at Veligallu, Anantapur District.

Project Detail
Topographical Contour survey at Ayana, 250 MW solar power Plant at Veligallu, Anantapur District.

Authority Under Whom Executed
TATA Power Solar
78, Electronics city, Phase-I, Hasur road, Bangaluru- 560100

Time Taken: 2 Month

Remarks: Surveying along the proposed peripheral boundary wall of plot of approx. 1250 acre and plotting spot levels at interval of 5M with boundary coordinates etc. Construction of Permanent Benchmark Pillars (PBM)

145. Soil Investigation and Topographical Survey work for Proposed RO at Luhari, Jhansi.

Project Detail
Soil Investigation and Topographical Survey work for Proposed RO at Luhari, Jhansi.

Authority Under Whom Executed
Indian Oil Corporation Limited
Kalpi Road, Jhansi

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth. Topographical Survey Work.

146. Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway,

Project Detail
Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Authority Under Whom Executed
To, The Deputy Chief Engineer (Const) I,
Western Railway, Indore 452001

Time Taken: 6 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

147. Geotechnical Investigation for different location of Railway Major Bridges, RUB, ROB and Deep Cutting etc. Between CH: 0 KM To 73 KM (Satna To Panna Section) of Lalitpur Singarauli New BG Rail Line Project.

Project Detail
Geotechnical Investigation for different location of Railway Major Bridges, RUB, ROB and Deep Cutting etc. Between CH: 0 KM To 73 KM (Satna To Panna Section) of Lalitpur Singarauli New BG Rail Line Project.

Authority Under Whom Executed
To, Dy. Chief Engineer-III (Construction),
West Central Railway, Construction Complex, Habibganj Station (East), Bhopal-462024

Time Taken: 6 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

148. Preparation of Detailed Project Report for Gorakhpur Link Expressway Under UPEIDA-Detailed Geotechnical Investigation.

Project Detail
Preparation of Detailed Project Report for Gorakhpur Link Expressway Under UPEIDA-Detailed Geotechnical Investigation.

Authority Under Whom Executed
KITCO Ltd.
Regd. Office: Femith's P.B. No. 4407, Puthiya Road, NH Bypass Vennala, Kochi-682028, Kerala

Time Taken: 4 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting modified proctor test for OMC & MDD and submission of results

149. Soil Investigation in connection with Chandil - Burnpur 3rd Line Project.

Project Detail
Soil Investigation in connection with Chandil - Burnpur 3rd Line Project.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

150. Soil Investigation between Kandra to Chandil for 3rd Line Work.

Project Detail
Soil Investigation between Kandra to Chandil for 3rd Line Work.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

151. Soil investigation between Adra-Snaka-Rukni for doubling work.

Project Detail
Soil investigation between Adra-Snaka-Rukni for doubling work.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

152. Soil Investigation between Joychandipahar to Sanka for doubling work.

Project Detail
Soil Investigation between Joychandipahar to Sanka for doubling work.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

153. Soil Investigation and K Value Test at Air force Station, Gorakhpur.

Project Detail
Soil Investigation and K Value Test at Air force Station, Gorakhpur.

Authority Under Whom Executed
Garrison Engineer (AF)
Military Engineer Services Gorakhpur.

Time Taken: 4 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Standard Test for modulus of sub grade reaction test to be performed according to IS9214-1979

154. Geotechnical Investigation for Nasik Metro. (MRTS)

Project Detail
Geotechnical Investigation for Nasik Metro. (MRTS)

Authority Under Whom Executed
The JGM/GT
RITES Ltd, Rites Bhawan, Plot No. 1, Sector-29, Gurgaon.

Time Taken: 75 Days

Remarks: Drilling of NX/NQ size borehole in all types of Soils/Rock. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

155. Geotechnical Investigation for additional work for Consultancy Services for 5 ROB's on Khurja-Dadri Section of EDFCCIL.

Project Detail
Geotechnical Investigation for additional work for Consultancy Services for 5 ROB's on Khurja-Dadri Section of EDFCCIL.

Authority Under Whom Executed
The JGM/GT
RITES Ltd, Rites Bhawan, Plot No. 1, Sector-29, Gurgaon.

Time Taken: 30 Days

Remarks:Drilling of NX/NQ size borehole in all types of Soils/Rock. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

156. Geotechnical Investigation/Soil Investigation work for Proposed Construction of Hospital, Teaching Block, Housing, Hostel & Service Block for Medical College Nahan, (HP)

Project Detail
Geotechnical Investigation/Soil Investigation work for Proposed Construction of Hospital, Teaching Block, Housing, Hostel & Service Block for Medical College Nahan, (HP)

Authority Under Whom Executed
To, Shapoorji Pallonji And Company Pvt. Ltd.
3rd Floor, Videocon Tower, Block E-1, Jhandewalan Extension, New Delhi.

Time Taken: 1 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Trial Pit 2mX2mX3m & ERT Test.

157. Geotechnical Investigation for Construction of 564 MLD WWTP at OkhlaUnder YAP-III (Package-O).

Project Detail
Geotechnical Investigation for Construction of 564 MLD WWTP at OkhlaUnder YAP-III (Package-O).

Authority Under Whom Executed
To, Suez India Private Limited
LGF A-1/132, Safdarjung Enclave, New Delhi – 110029

Time Taken: 2 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

158. Soil Investigation work for proposed Hall of Residence for Boys No. 14, 15 & Common dining facility & New building for BSBE department.

Project Detail
Soil Investigation work for proposed Hall of Residence for Boys No. 14, 15 & Common dining facility & New building for BSBE department.

Authority Under Whom Executed
The Executive Engineer
Indian Institute of Technology Kanpur, IWD-Division-III, Kanpur.

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

159. Geotechnical Investigation work for proposed BO at Itarsi.

Project Detail
Geotechnical Investigation work for proposed BO at Itarsi.

Authority Under Whom Executed
The Asstt. Exe. Engineer
LIC of India, Engineering Department, CZO, Bhopal

Time Taken: 2 Month

Remarks: Drilling of NX/NQ size borehole in all types of Soils/Rock. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

160. Contract Geo-Tech/V: Geotechnical Investigation work from Kishangarh Station to Saket G Block Via Chattarpur of Phase-IV Project.

Project Detail
Contract Geo-Tech/V: Geotechnical Investigation work from Kishangarh Station to Saket G Block Via Chattarpur of Phase-IV Project.

Authority Under Whom Executed
The Project Manager-5B
Delhi Metro Rail Corporation Ltd. Dhaula Kuan, New Delhi

Time Taken: 4 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting seismic refraction test.

161. Geotechnical Investigation work of Proposed Metro Corridor from Sector-51 Noida to Greater Noida Sector-2.

Project Detail
Geotechnical Investigation work of Proposed Metro Corridor from Sector-51 Noida to Greater Noida Sector-2.

Authority Under Whom Executed
The DGM/Civil-I
Noida Metro Rail Corporation Ltd Sector-29, Noida.

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

162. Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-I) at Saharanpur, UP.

Project Detail
Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-I) at Saharanpur, UP.

Authority Under Whom Executed
Rays Power Infra Pvt. Ltd.
320, 3rd Floor, Murli Bhawan, Ashok Marg, Lucknow.

Time Taken: 2 Month

Remarks:Drilling of NX size borehole in all types of soil strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Electrical Resistivity Test, Lab CBR Test.

163. Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-II) at Saharanpur, UP.

Project Detail
Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-II) at Saharanpur, UP.

Authority Under Whom Executed
Rays Power Infra Pvt. Ltd.
320, 3rd Floor, Murli Bhawan, Ashok Marg, Lucknow.

Time Taken: 2 Month

Remarks: Drilling of NX size borehole in all types of soil strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Electrical Resistivity Test, Lab CBR Test.

164. Geotechnical Investigation for preparation of DPR for Metro Rail Connection from Rezangla chowk, Gurgaon to Sector-24, Dwarka.

Project Detail
Geotechnical Investigation for preparation of DPR for Metro Rail Connection from Rezangla chowk, Gurgaon to Sector-24, Dwarka.

Authority Under Whom Executed
The JGM/GT
RITES Ltd, Rites Bhawan, Plot No. 1, Sector-29, Gurgaon.

Time Taken: 2 Month

Remarks: Drilling of NX/NQ size borehole in all types of Soils/Rock. Collection of disturbed/ undisturbed soil samples and water sample. Conducting Standard Penetration test as per IS: 2131.

165. Soil Investigation for minor bridge on Arhi drain at Approach road from Poore Ramdin to Poore Gujran in Jagdishpur, Distt-Amethi.

Project Detail
Soil Investigation for minor bridge on Arhi drain at Approach road from Poore Ramdin to Poore Gujran in Jagdishpur, Distt-Amethi.

Authority Under Whom Executed
Executive Engineer, CD-UP
Public Works Department, Construction Division, Gauriganj, Amethi-227409

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

166. Soil Investigation for minor bridge on Mungtal Drain at approach road for Sarai Mahesa to Agauna, Poore Redrashah, Mohana, Distt-Amethi.

Project Detail
Soil Investigation for minor bridge on Mungtal Drain at approach road for Sarai Mahesa to Agauna, Poore Redrashah, Mohana, Distt-Amethi.

Authority Under Whom Executed
Executive Engineer, CD-UP
Public Works Department, Construction Division, Gauriganj, Amethi-227409

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

167. Geotechnical investigation for proposed 200 person multi storied hostel block at Sultanpur.

Project Detail
Geotechnical investigation for proposed 200 person multi storied hostel block at Sultanpur.

Authority Under Whom Executed
Executive Engineer,
Construction Division-III Public Works Department Hathiya Nala, Afim Kothi, Sultanpur, U.P.-228001

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

168. Geotechnical investigation work for proposed upgradation of existing bridges near Chanda.

Project Detail
Geotechnical investigation work for proposed upgradation of existing bridges near Chanda.

Authority Under Whom Executed
Executive Engineer,
Construction Division-III Public Works Department Hathiya Nala, Afim Kothi, Sultanpur, U.P.-228001

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

169. Geotechnical investigation work for proposed upgradation of existing bridges near Aliganj.

Project Detail
Geotechnical investigation work for proposed upgradation of existing bridges near Aliganj.

Authority Under Whom Executed
Executive Engineer,
Construction Division-III Public Works Department Hathiya Nala, Afim Kothi, Sultanpur, U.P.-228001

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

170. Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-III) at Saharanpur, UP.

Project Detail
Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-III) at Saharanpur, UP.

Authority Under Whom Executed
Rays Power Infra Pvt. Ltd.
320, 3rd Floor, Murli Bhawan, Ashok Marg, Lucknow.

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

171. Geotechnical Investigation for widening and reconstruction of existing intermediate to 2 lane with paved shoulder configuration from existing Km. 268.00 to Km 300.00 of NH-58 (Kaudiyala to Devprayag Road) in the state of Uttarakhand.

Project Detail
Geotechnical Investigation for widening and reconstruction of existing intermediate to 2 lane with paved shoulder configuration from existing Km. 268.00 to Km 300.00 of NH-58 (Kaudiyala to Devprayag Road) in the state of Uttarakhand.

Authority Under Whom Executed
ESPAN Infrastructure (I) Ltd
B-7, Sector-36, Noida. B-405, Nirman Vihar, Delhi.

Time Taken: 4 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

172. Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. elevated station (IIT Kanpur, Kalyanpur Railway Station, SPM Hospital, Kanpur University, Gurudev Chauraha, Geeta Nagar, Rawatpur, LLR Hospital & Motijheel Metro Station) including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Project Detail
Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. (IIT Kanpur, Kalyanpur Railway Station, SPM Hospital, Kanpur University, Gurudev Chauraha, Geeta Nagar, Rawatpur, LLR Hospital & Motijheel Metro Station) elevated station including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Authority Under Whom Executed
Afcons Infrastructure Ltd,
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

173. Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Project Detail
Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Authority Under Whom Executed
Deputy Chief Engineer (Const) IV
Western Railway, Indore 452001

Time Taken: 12 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

174. Geotechnical Investigation work for Preparation of DPR of Delhi-Ludhiana –Amritsar –Karta Expressway having an approximate length of 600 km.

Project Detail
Geotechnical Investigation work for Preparation of DPR of Delhi-Ludhiana –Amritsar –Karta Expressway having an approximate length of 600 km.

Authority Under Whom Executed
Feedback Infra Pvt. Ltd.
15th Floor, Building 9B, DLF Cyber City, Phase 3, Gurugram - 122 002, India

Time Taken: 6 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

175. Rate Contract for Three Year for Carrying out Soil Investigation/Geotechnical Investigation, Topographical and Contour Surveying works at different location including ROs and KSKs Under UPSO-1

Project Detail
Rate Contract for Three Year for Carrying out Soil Investigation/Geotechnical Investigation, Topographical and Contour Surveying works at different location including ROs and KSKs Under UPSO-1

Authority Under Whom Executed
GM (Engg)
Indian Oil Corporation Limited, Uttar Pradesh State office, Indian Oil Bhawan, TC-39V, Vibhuti Khand, Gomti Nagar, Lucknow.

Time Taken: 3 Year

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

176. Geotechnical Investigation work for the Proposed Metro Alignment from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (via. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj)

Project Detail
Geotechnical Investigation work for the Proposed Metro Alignment from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (via. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj)

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 3 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

177. Geotechnical Investigation works at different locations in proposed land for Depot (PAC) of Agra Metro Rail Project for Uttar Pradesh Metro Rail Corporation Ltd.

Project Detail
Geotechnical Investigation works at different locations in proposed land for Depot (PAC) of Agra Metro Rail Project for Uttar Pradesh Metro Rail Corporation Ltd.

Authority Under Whom Executed
Joint Chief Engineer (Civil)
Uttar Pradesh Metro Rail Corporation Ltd. (Agra Metro Rail Project) Lucknow

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

178. Contract KNPCC-02 (R1): Geotechnical Investigation work Proposed Metro Alignment from start of elevated ramp (after Juhi) to end of Naubasta station including Five elevated station (via. Baradevi, Kidwai Nagar, Vasant Vihar, Baudh Nagar, Naubasta).

Project Detail
Contract KNPCC-02 (R1): Geotechnical Investigation work Proposed Metro Alignment from start of elevated ramp (after Juhi) to end of Naubasta station including Five elevated station (via. Baradevi, Kidwai Nagar, Vasant Vihar, Baudh Nagar, Naubasta).

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 4 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

179. Geotechnical Investigation work Inside of IOCL Barauni for Proposed 220 KV Switch Yard at IOCL, Barauni.

Project Detail
Geotechnical Investigation work Inside of IOCL Barauni for Proposed 220 KV Switch Yard at IOCL, Barauni.

Authority Under Whom Executed
ABB Power Products & Systems India Ltd.
BIPL,Omega Building,13th Floor(Wing-North), Block-EP & GP,Salt Lake,Sector-V, Kolkata-700091,WB,India

Time Taken: 2 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Static Cone Penetration Tests at various locations, Dynamic Cone Penetration Tests at various locations, Plate Load Tests at various locations, Vane shear test at different locations, Cross Hole Shear Wave Test as per IS:13372 (1992)

180. Soil Investigation work for “AGCC 02: Design and Construction of Tunnel from start of underground ramp (near Fatehabad Road Metro station) to end of ramp after RBS college Metro station including seven underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India.

Project Detail
Soil Investigation work for “AGCC 02: Design and Construction of Tunnel from start of underground ramp (near Fatehabad Road Metro station) to end of ramp after RBS college Metro station including seven underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

181. Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Project Detail
Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

182. Geotechnical Investigation work for Proposed UPMRC office building at Lucknow.

Project Detail
Geotechnical Investigation work for Proposed UPMRC office building at Lucknow.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

183. Earth Resistivity Test for 220kV Pothead Yard at 4x125 MW Teesta-VI HE Project, Sikkim

Project Detail
Earth Resistivity Test for 220kV Pothead Yard at 4x125 MW Teesta-VI HE Project, Sikkim

Authority Under Whom Executed
Manager/TBSM
Bharat Heavy Electricals Limited TRANSMISSION BUSINESS GROUP Sub-Contracts Management, 10th Floor, Plot No.C-20/1A/1, Joy Tower, Sector-62, Noida - 201301

Time Taken:

Remarks:Earth Resistivity Test.

184. Electrical Resistivity Test for Proposed Metro Alignment Gr. Noida Sector 4 and Noida Sector-122.

Project Detail
Electrical Resistivity Test for Proposed Metro Alignment Gr. Noida Sector 4 and Noida Sector-122.

Authority Under Whom Executed
DGM/RS&E
Noida Metro Rail Corporation Ltd Block-III, 3rd Floor, Ganga Shopping Complex, Sector-29, Noida.

Time Taken:

Remarks:Electrical Resistivity Test

185. Geotechnical Investigation work Phase-II for Preparation of DPR of Delhi-Ludhiana –Amritsar –Karta Expressway having an approximate length of 600 km.

Project Detail
Geotechnical Investigation work Phase-II for Preparation of DPR of Delhi-Ludhiana –Amritsar –Karta Expressway having an approximate length of 600 km.

Authority Under Whom Executed
Feedback Infra Pvt. Ltd.
15th Floor, Building 9B, DLF Cyber City, Phase 3, Gurugram - 122 002, India

Time Taken:

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

186. Geotechnical Investigation work for the proposed Metrolite Corridor from Kirti Nagar to Bamnoli Village including Depot of DMRC LRTS Project.

Project Detail
Geotechnical Investigation work for the proposed Metrolite Corridor from Kirti Nagar to Bamnoli Village including Depot of DMRC LRTS Project.

Authority Under Whom Executed
Project Manager-10B
Delhi Metro Rail Corporation Ltd. Opp. Inderlok Metro Station, Shahzada Bagh, New Delhi.

Time Taken:

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

187. Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Project Detail
Soil Investigation work for “KNPCC 06: Design and Construction of TBM Tunnel, Cut & Cover Tunnel and underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India."

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

188. Contract DC 05: Geotechnical Investigation work (Including Pressuremeter test, Cross Hole Test, Permeability test in Soil & Rock) Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS.

Project Detail
Contract DC 05: Geotechnical Investigation work (Including Pressuremeter test, Cross Hole Test, Permeability test in Soil & Rock) Design & Construction of Twin Tunnel by shield TBM, Tunnel by Cut & Cover, Underground ramp at Derawal Nagar and Six underground stations viz. Derawal Nagar, Ghanta Ghar, Pulbangash, Sadar Bazar, Nabi Karim & Ramakrishna Ashram Marg Including Architectural Finishing, Water supply, Sanitary installation, Drainage works of stations on Janakpuri West to R.K. Ashram Corridor (Line-8 Ext.) of Phase-IV of Delhi MRTS.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken: Four Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

189. Geotechnical Investigation work for proposed Greenfield manufacturing facility for Yeast production Facility in Pilibhit, Uttar Pradesh.

Project Detail
Geotechnical Investigation work for proposed Greenfield manufacturing facility for Yeast production Facility in Pilibhit, Uttar Pradesh.

Authority Under Whom Executed
AB MAURI INDIA PVT. LTD.
PLOT NO.A1, UPSIDC/UPSIDA INDUSTRIAL HUB, BHARA PACHPERA, MAJHOLA SITARGANJ ROAD, UPSIDC/UPSIDA INDUSTRIAL HUB, AMARIA, PILIBHIT, UTTAR PRADESH-262121

Time Taken: 2 Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

190. Geotechnical Investigation work for proposed Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of Uttar Pradesh under Bharatmala on EPC Mode.

Project Detail
Geotechnical Investigation work for proposed Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km. 43.200 (near Mahuari) to design km. 50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) Package-2 under Phase-I on NH-19 in the state of Uttar Pradesh under Bharatmala on EPC Mode.

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken: 2 Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

191. Geotechnical Investigation work for proposed four elevated metro station (viz. Vijay Nagar, Shastri Chowk, Barra-7 & Barra-8/ Ram Gopal Chauraha) on Corridor-2 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India.

Project Detail
Geotechnical Investigation work for proposed four elevated metro station (viz. Vijay Nagar, Shastri Chowk, Barra-7 & Barra-8/ Ram Gopal Chauraha) on Corridor-2 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India.

Authority Under Whom Executed
JMC Projects India Limited
3RD FLOOR (West),KALPATARU SYNERGY,OPP. GRAND HYATT, VAKOLA,SANTACRUZ (E ),SANTACRUZ, MUMBAI,400055

Time Taken: 6 Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

192. Geotechnical Investigation for the proposed Rail Flyovers (RFO) near Pt. Deen Dayal Upadhyay Stations in connection with construction of Eastern Dedicated Freight Corridor.

Project Detail
Geotechnical Investigation for the proposed Rail Flyovers (RFO) near Pt. Deen Dayal Upadhyay Stations in connection with construction of Eastern Dedicated Freight Corridor.

Authority Under Whom Executed
RITES Limited
RITES Bhawan, Plot No. 1, Sec-29, Gurgaon, Haryana-122 001

Time Taken: 3 Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

193. Geotechnical investigation & soil exploration for Major bridges, ROBs and Soil testing of sub-base of formation and minor bridges between kms 20.15 to 88.75kms in Govindgarh-Sidhi section in connection with Rewa-Sidhi new B.G. Rail line project.

Project Detail
Geotechnical investigation & soil exploration for Major bridges, ROBs and Soil testing of sub-base of formation and minor bridges between kms 20.15 to 88.75kms in Govindgarh-Sidhi section in connection with Rewa-Sidhi new B.G. Rail line project.

Authority Under Whom Executed
DYCE-C-I-JBP ENGINEERING
2nd floor, DRM office, Jabalpur, 482001

Time Taken: 12 Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

194. Vertical static pile load test Work at RUDRA SOLITAIRE, KANPUR.

Project Detail
Vertical static pile load test Work at RUDRA SOLITAIRE, KANPUR.

Authority Under Whom Executed
KANPUR INFRADEVELOPERS LLP
15/63, 1st Floor, Rudra House, Civil Lines, Kanpur - 208001

Time Taken: 1 Month

Remarks:Vertical load testing of test piles in accordance with IS 2911 (Part-IV) including excavation of pit up to the cut-off level of pile, installation of measuring instrument, preparation of pile head and conducting the vertical pile load test etc.

195. Geotechnical Investigation work for proposed intermediate Pillar (Temporary) between P313 & P314 at the start of ramp of corridor-1 of Kanpur Metro, Kanpur

Project Detail
Geotechnical Investigation work for proposed intermediate Pillar (Temporary) between P313 & P314 at the start of ramp of corridor-1 of Kanpur Metro, Kanpur

Authority Under Whom Executed
AFCONS Infrastructure Ltd.
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

196. Plate Load Test at BS park for balance work of elevated metro project from IIT K to Motijheel, Kanpur.

Project Detail
Plate Load Test at BS park for balance work of elevated metro project from IIT K to Motijheel, Kanpur.

Authority Under Whom Executed
AFCONS Infrastructure Ltd.
AFCONS House, 16, Shah Industrial Estate, Veera Desai Road, Azad Nagar, P.B No. 11978, Andheri (West), Mumbai-400 053

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

197. Soil Investigation for LIC Plot at Morena for Proposed Construction of BO Building and Officers Quarters under DO Gwalior.

Project Detail
Soil Investigation for LIC Plot at Morena for Proposed Construction of BO Building and Officers Quarters under DO Gwalior.

Authority Under Whom Executed
LIC of India
Engineering Department, Central Zonal Office, 60-B, “Jeevan Shikha” Hoshangabad Road, P.B. No. 28, Bhopal-462011

Time Taken:

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

198. Geotechnical Investigation In Package No. BH-05 (Pre-Tender): Part Design and Construction of elevated Viaduct, thirteen (13) elevated Metro Rail Stations viz. Bhadbhada Square, Depot Chauraha, Jawahar Chowk, Roshanpura Chauraha, Kushabhau Thakre Hall, Parade Ground, Prabhat Chauraha, Govindpura, Govindpura Industrial Area, JK Road, Indrapuri, Piplani and Ratnagiri Tiraha (excluding an Elevated Passenger Interchange Metro Rail Station), between Chainages 50+000 and 62+903, and access to Depot between Chainages 00+155 and 01+020 for Blue Line for Bhopal Metro Rail Project.

Project Detail
Geotechnical Investigation In Package No. BH-05 (Pre-Tender): Part Design and Construction of elevated Viaduct, thirteen (13) elevated Metro Rail Stations viz. Bhadbhada Square, Depot Chauraha, Jawahar Chowk, Roshanpura Chauraha, Kushabhau Thakre Hall, Parade Ground, Prabhat Chauraha, Govindpura, Govindpura Industrial Area, JK Road, Indrapuri, Piplani and Ratnagiri Tiraha (excluding an Elevated Passenger Interchange Metro Rail Station), between Chainages 50+000 and 62+903, and access to Depot between Chainages 00+155 and 01+020 for Blue Line for Bhopal Metro Rail Project.

Authority Under Whom Executed
Kalpataru Projects International Ltd
6th floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz, (E),Mumbai-400055

Time Taken: Two Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

199. Geotechnical Investigation & Packer Test. Package No. BH-04 (Pre-Tender): Design & Construction of Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without sump, Ramps, two (02) Underground Stations (Nadra Bus Stand and Bhopal Railway Station) including Architectural finishing, Water Supply, Sanitary Installation and Drainage works in entire Underground Section from chainage 28+375 to 31+765 for Bhopal Metro Rail Project.

Project Detail
Geotechnical Investigation & Packer Test. Package No. BH-04 (Pre-Tender): Design & Construction of Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without sump, Ramps, two (02) Underground Stations (Nadra Bus Stand and Bhopal Railway Station) including Architectural finishing, Water Supply, Sanitary Installation and Drainage works in entire Underground Section from chainage 28+375 to 31+765 for Bhopal Metro Rail Project.

Authority Under Whom Executed
Kalpataru Projects International Ltd
6th floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz, (E),Mumbai-400055

Time Taken: 2 Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

200. AGCC-06 (Pre-Tender): Geotechnical Investigation work for proposed construction of elevated viaduct and 07 Nos. elevated stations (viz. Agra Cantt, Sadar Bazar, Pratap Pura, Collectorate, Agra College, Hariparvat chauraha and Sanjay Place metro stations) including Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures of Corridor-2 of Agra Metro at Agra, Uttar Pradesh, India.

Project Detail
AGCC-06 (Pre-Tender): Geotechnical Investigation work for proposed construction of elevated viaduct and 07 Nos. elevated stations (viz. Agra Cantt, Sadar Bazar, Pratap Pura, Collectorate, Agra College, Hariparvat chauraha and Sanjay Place metro stations) including Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures of Corridor-2 of Agra Metro at Agra, Uttar Pradesh, India.

Authority Under Whom Executed
Kalpataru Projects International Ltd
6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai-400055

Time Taken: 2 Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

Clients

Techpro Engineers Pvt. Ltd. 2015. All Rights Reserved.