Empanelled with MoRTH under
Category IV : GeoTechnical Investigation
Afcons Infrastructure Limited
Complete Project

1. Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. elevated station including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. elevated station including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Authority Under Whom Executed
Afcons Infrastructure Ltd,
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Time Taken: 1 Month

Remarks: All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Permeability test In over burden using falling head.

Running Project

1. Geotechnical Investigation work for the Proposed Metro Alignment from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (via. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj)

Project Type: Sub-Soil Investigation

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Value Of Work:

Date of Assign the Contract: 03.09.2020

Completion Date: 02.01.2021

2. Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.

Project Type: Sub-Soil Investigation

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Value Of Work:

Date of Assign the Contract: 07.11.2020

Completion Date: 07.12.2020

3. Contract KNPCC-02 (R1): Geotechnical Investigation work Proposed Metro Alignment from start of elevated ramp (after Juhi) to end of Naubasta station including Five elevated station (via. Baradevi, Kidwai Nagar, Vasant Vihar, Baudh Nagar, Naubasta).

Project Type: Sub-Soil Investigation

Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Value Of Work:

Date of Assign the Contract: 03.09.2020

Completion Date: 02.12.2020

Clients

Techpro Engineers Pvt. Ltd. 2015. All Rights Reserved.