Project Detail
Conversion of existing steel processing plant to rolling mills.
Authority Under Whom Executed
Steel Authority of India Ltd.
Rourkela steel plant, Rourkela- 066- 12445604
Time Taken: 3 Month
Remarks:Making test bore of 150 mm dia as per 1892 on all type of soil maintaining necessary driving records and presenting test results in bore log form including taking un- disturbed/ disturbed samples and conducting Standard Penetration Test at various Depth in soil. Drilling through soft or fractured rock (excluding hard roch) at all depth using rotary drilling equipments including recovery of core and provision of core box using TC bitd. Conducting all relevant laboratory test and submission of test report. Conducting Electrical Resistivity Test of soil as per IS 3043- 1987 Conducting Block Vibration Test on samples collected. Conducting California Bearing Resistivity test at proposed area & Area survey.
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
Bharat Heavy Electricals Limited. (BHEL)
(A Government of india Undertaking) Electronics Division, P.B. No. 2606, Mysore Road, Bangalore-560026
Time Taken: 1.5 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths with some special tests like Conducting Electrical Resistivity Test of soil as per IS 3043- 1987, Field CBR Test, Topographical Survey work.
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633
Time Taken: 1 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633
Time Taken: 1.5 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633
Time Taken: 1.5 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
Executive Director (Projects)
PROJECT DEPARTMENT IISCO Steel Plant, Burnpur 713325 (W B)
Time Taken: 2 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Electrical Resistivity Test of soil as per IS 3043- 1987 Topographical Survey work.
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
Military Engineer Service Chief Engineer (Fy) Hyderabad.
Opp. Parade Grounds Sardar Patel Road, Secunderabad-500003
Time Taken: 2.5 Month
Remarks:Making test bore of 150 mm dia Drilling through soft or fractured rock (excluding hard rock) at all depth using rotary drilling equipments including recovery of core and provision of core box using TC bitd. Conducting all relevant laboratory test and submission of test report. Topographical Survey, Field CBR Test
Project Detail
Geo Technical work for elaborate safe bearing capacity for different type of structures block.
Authority Under Whom Executed
To, Dy.General Manager
HSCC (India) Ltd. E - 6(A), Sector -1, NOIDA, Uttar Pradesh. Pin-201301.
Time Taken: 2 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth. Topographical Survey at Various Locations.
Project Detail
Surveying Along the Proposed Compound wall Alignment of NUPPL- Ghatampur Thermal Power Project- 3x660MW , UP
Authority Under Whom Executed
To, General Manager/Civil
Neyveli Lignite Cor. Ltd, Neyveli.
Time Taken: 45 Days
Remarks:Surveying along the boundary of Plant area. Surveying along the proposed compound wall and plotting spot levels at intervals of 5M with boundary coordinates etc. RCC Pillars, Brick Pillars.
Project Detail
Surveying Along the Acquired land of the NUPPL-Ghatampur Thermal Power Project (3x660MW), U.P.
Authority Under Whom Executed
To, Dy. General Manager Civil,
NUPPL, Kanpur
Time Taken: 45 Days
Remarks:Surveying along the boundary of Plant area. Surveying along the proposed compound wall and plotting spot levels at intervals of 5M with boundary coordinates etc. Brick Pillars.
Project Detail
Topographical Survey and Soil Testing & Investigation for 50MW PV Solar Project at Kadiri, Anantapur, Dist. Andhra Pradesh.
Authority Under Whom Executed
To, The Manager (SC&PV-PVSS), BHEL, Electronics Division, Bangalore-560026
Time Taken: 1 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths with some special tests like Topographical Survey Work, Trial Pit, Field CBR Test, ERT Test.
Project Detail
Surveying and demarcation & numbering of trees at proposed 220 k.v s/s Papankalan III (Dwarka Sec. 19)
Authority Under Whom Executed
To, Manager (T) Civil, III, Delhi Transco Limited Shaktideep Building Jhandewalan. New Delhi -55
Time Taken: 1 Month
Remarks:Surveying and demarcation & numbering of trees at proposed 220 k.v s/s Papankalan III (Dwarka Sec. 19)
Project Detail
Conducting Topographical Survey at Bokaro Steel Limited (BSL), Bokaro Steel City, Jharkhand.
Authority Under Whom Executed
Dy. General Manager MECON Limited.
Ispat Bhavan, C Block (2nd Floor), Bokaro Steel City -827001 Jharkhand
Time Taken: 21 Days.
Remarks:Topographical Survey and allied works including jungle clearance’ for the entire area / areas indicated for locating the various facilities of Power Supply System for Sinter Plant-II adjacent to the existing Sinter Plant of BSL at Bokaro Steel City.
Project Detail
Survey work along the Proposed road connecting GTPS Gate No. 1 to NH 86 at NUPPL Site Ghatampur, Kanpur Nagar
Authority Under Whom Executed
To, Dy. General Manager Civil,
NUPPL, Kanpur
Time Taken: 1 Month
Remarks:Survey work along the Proposed road connecting GTPS Gate No. 1 to NH 86 at NUPPL Site Ghatampur, Kanpur Nagar
Project Detail
Topographical and Cross Section and L-Section from Main Road to Sub- Station area and Soil Investigation etc. for land of S/S area at Proposed 220KV S/S Rania.
Authority Under Whom Executed
The Executive Engineer, UPPTCL, Electricity Civil Transmission Division, Kanpur
Electricity Civil Transmission Division, Kanpur
Time Taken: 1 Month
Remarks:Topographical survey including preparation of cross section and longitudinal section and other relevant details of approach road (Approx 800M) main road to proposed sub station area
Project Detail
Soil Testing and Contouring at 132 KV S/S Gabhana, Distt- Aligarh.
Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Aligarh
Time Taken: 1 Month
Remarks:Topographical survey including preparation of cross section and longitudinal section and other relevant details
Project Detail
Soil Testing and Contouring at 132 KV S/S Sultanganj, Distt- Mainpuri
Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Aligarh
Time Taken: 1 Month
Remarks:Topographical survey including preparation of cross section and longitudinal section and other relevant details
Project Detail
Soil Testing & Contouring Survey at 132 KV S/S Banda, Shahjahanpur.
Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Rampur Bagh, Bareilly.
Time Taken: 1 Month
Remarks:Topographical survey including preparation of cross section and longitudinalsection and other relevant details
Project Detail
Soil Testing & Contouring Survey at 132 KV S/S Jalalabad, Shahjahanpur.
Authority Under Whom Executed
The Executive Engineer, UPPTCL,
Electricity Civil Transmission Division, Rampur Bagh, Bareilly.
Time Taken: 1 Month
Remarks:Topographical survey including preparation of cross section and longitudinalsection and other relevant details
Project Detail
Soil Investigation and Survey of a land Parcel of DDA at Sanjay Lake Park, Trilokpuri, New Delhi.
Authority Under Whom Executed
To, Chief General Manager (RE), NBCC Ltd.
1st Floor, NBCC Place, Bhishma Pitamah Marg, New Delhi.
Time Taken: 1 Month
Remarks:detailed topographical survey work by Electronic total station (Digital Survey Equipment) i.e. to pin point all salient features such as roads, building, trees, water body, play field, green area, water supply lines, sewer lines, electric/telephonic lines with poles, wells etc complete taking all the boundary measurement, internal angles, North direction, preparation of survey drawing including spot levels/ contours on grids 25m x 25m and plotting on Auto CAD. Construction of Bench Marks as per CPWD Specifications
Project Detail
Geo-Technical (SOIL) Investigation & Topographical Survey for 100 bedded MCH Buildings at Etah.
Authority Under Whom Executed
To, Dy.General Manager
HSCC (India) Ltd.
E 6(A), Sector -1, NOIDA, Uttar Pradesh. Pin-201301.
Time Taken: 1 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth. Topographical Survey at Various Locations.
Project Detail
Topographical Survey and Geotechnical Investigation work at Budge Budge Bottling Plant, West Bengal
Authority Under Whom Executed
To, Dy. General Manager (LPG) I/C, Indian Oil Cor. Ltd., West Bengal State Office.
Time Taken: 1.5 Month's
Remarks:Topographical Survey Works. All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.
Project Detail
Topographical Survey and Soil Sampling Work for evaluation of Carbon Slurry at NFL, Bhatinda & Nangal.
Authority Under Whom Executed
To, The Addl. General Manager (MM), PDIL, Noida.
Time Taken: 1 Month
Remarks:Topographical Survey Works. All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.
Project Detail
Topographical Survey and Soil Testing & Investigation for 10MW Solar Photovoltaic Power Plant at Mejia, West Bengal. (WBSEDCL)
Authority Under Whom Executed
To, Sr. Manager/SC&PV-PVSS
BHEL, Electronics Division,
Bangalore-560026
Time Taken: 1 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work, CBR Test, ERT Test.
Project Detail
Topographical Survey and Soil Testing & Investigation for 10MW Solar Photovoltaic Power Plant at Chharrah, West Bengal. (WBSEDCL)
Authority Under Whom Executed
To, Sr. Manager/SC&PV-PVSS
BHEL, Electronics Division,
Bangalore-560026
Time Taken: 1 Month
Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Topographical Survey Work, CBR Test, ERT Test.
Project Detail
Topographical Survey work for Granulated Single Super Phosphate Project at FAGMIL, Chittorgarh (Raj.)
Authority Under Whom Executed
To, Addl, GM (MM),
Projects & Development India Limited, A-14, Sector-1, Noida-201301
Time Taken: 1 Month
Remarks:Topographical Survey Work , Grid Pillars using 200 mm dia x 1000 mm long RCC Hume pipe with 400 mm dia x 500 mm and Permanent Bench Mark Pillars of size 1000 mm x 1000 mm x 1500 mm, Transferring Bench Mark.
Project Detail
Topographical, Geotechnical & Hydro-geological survey work for setting up of New AIIMS at Gorakhpur. (U.P.)
Authority Under Whom Executed
To, DGM (Project), HSCC (India) Ltd,
E-6(A), Sector-1,
Noida-201301 (U.P.)
Time Taken: 2 Month
Remarks:Carrying out topographical survey including transferring the level from nearest available permanent G.T.S. benchmark.
Project Detail
Topographical Contour Survey work for proposed construction of Kanpur Divisional office at Kanpur
Authority Under Whom Executed
Indian Oil Corporation Limited
Kalpi Road, Kanpur
Time Taken: 15 Days
Remarks:Topographical Contour Survey work.
Project Detail
Topographical Contour Survey work for Proposed RO at Kanpur.
Authority Under Whom Executed
Indian Oil Corporation Limited
Kalpi Road, Kanpur
Time Taken: 15 Days
Remarks:Topographical Contour Survey work for Proposed RO at Kanpur.
Project Detail
Topographical Survey work for proposed 250 MW Solar Power Project at Anantapur, Andhra Pradesh.
Authority Under Whom Executed
SBG Cleantech Project Co Five Pvt. Ltd.
Plot No. 43, Ananthapuram Ultra Mega Solar Park,
Anantapur, Andhra Pradesh.
Time Taken: 3 Month
Remarks:Topographical Survey work, Construction of BM and Boundary Pillars.
Project Detail
Conducting of Preliminary Survey and Preparation of Land Plan & Land Schedule making Pillars for Construction of Necessary Railway Infrastructure for Proposed transportation of coal by WBPDCL its Power Plants to be mined from Panchwara (North), Jharkhand.
Authority Under Whom Executed
The General Manager (Projects)
RITES Limited, Regional Project office, 56, C.R. Avenue, 2nd Floor, K
Time Taken:
Remarks:Preliminary Engineering Survey with Total Station instrument (1 second accuracy with calibrated) including traversing along the proposed alignment, taking details of 200 m corridor existing topographical features such as bridge including HFL, roads, rivers nallas, canals, waterways, buildings village boundary, boundary wall, overhead power line with posts/ towers, communication line with posts/towers etc.
Project Detail
Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.
Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053
Time Taken: 1 Month
Remarks:Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.