Project Type: Topographical Survey
Contract Value:
Project Detail
Topographical Survey work for proposed 250 MW Solar Power Project at Anantapur, Andhra Pradesh.
Authority Under Whom Executed
SBG Cleantech Project Co Five Pvt. Ltd.
Plot No. 43, Ananthapuram Ultra Mega Solar Park,
Anantapur, Andhra Pradesh.
Time Taken: 3 Month
Remarks:Topographical Survey work, Construction of BM and Boundary Pillars.
Project Type: Sub-Soil Investigation
Contract Value:
Project Detail
Topographical Survey work for proposed 200 MW Solar Power Plant (Pavagada Solar Park) at Karnataka- Block B23 to B26)
Authority Under Whom Executed
SBG Cleantech Project Co Five Pvt. Ltd.
Block No. B23 to B26, 2000MW Pavagada Solar Park
Phase II, Taluk, Pavagada, Distt-Tumkur,
Karnataka.
Time Taken: 3 Month
Remarks:Topographical Survey work, Construction of BM and Boundary Pillars.
Project Type: Sub-Soil Investigation
Contract Value:
Project Detail
Soil Investigation work for Proposed 200 MW Solar Power Plant (Pavagada Solar Park) at Karnataka- Block B23 to B26)
Authority Under Whom Executed
SBG Cleantech Project Co Five Pvt. Ltd.
Block No. B23 to B26, 2000 MW Pavagada Solar Park
Phase II, Taluk, Pavagada, Distt-Tumkur,
Karnataka.
Time Taken: 3 Month
Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Electrical Resistivity Test. Thermal Resistivity Test. Pile pull out and lateral load test (including casting of reaction pile) to assess pile resistance to uplift and lateral resistance.