Empanelled with MoRTH under
Category IV : GeoTechnical Investigation
Kalpataru Projects International Ltd
Complete Project

1. Geotechnical Investigation In Package No. BH-05 (Pre-Tender): Part Design and Construction of elevated Viaduct, thirteen (13) elevated Metro Rail Stations viz. Bhadbhada Square, Depot Chauraha, Jawahar Chowk, Roshanpura Chauraha, Kushabhau Thakre Hall, Parade Ground, Prabhat Chauraha, Govindpura, Govindpura Industrial Area, JK Road, Indrapuri, Piplani and Ratnagiri Tiraha (excluding an Elevated Passenger Interchange Metro Rail Station), between Chainages 50+000 and 62+903, and access to Depot between Chainages 00+155 and 01+020 for Blue Line for Bhopal Metro Rail Project.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation In Package No. BH-05 (Pre-Tender): Part Design and Construction of elevated Viaduct, thirteen (13) elevated Metro Rail Stations viz. Bhadbhada Square, Depot Chauraha, Jawahar Chowk, Roshanpura Chauraha, Kushabhau Thakre Hall, Parade Ground, Prabhat Chauraha, Govindpura, Govindpura Industrial Area, JK Road, Indrapuri, Piplani and Ratnagiri Tiraha (excluding an Elevated Passenger Interchange Metro Rail Station), between Chainages 50+000 and 62+903, and access to Depot between Chainages 00+155 and 01+020 for Blue Line for Bhopal Metro Rail Project.

Authority Under Whom Executed
Kalpataru Projects International Ltd
6th floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz, (E),Mumbai-400055

Time Taken: Two Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

2. Geotechnical Investigation & Packer Test. Package No. BH-04 (Pre-Tender): Design & Construction of Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without sump, Ramps, two (02) Underground Stations (Nadra Bus Stand and Bhopal Railway Station) including Architectural finishing, Water Supply, Sanitary Installation and Drainage works in entire Underground Section from chainage 28+375 to 31+765 for Bhopal Metro Rail Project.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation & Packer Test. Package No. BH-04 (Pre-Tender): Design & Construction of Twin Tunnel (Up & Down by Shield TBM), Cut & Cover, Cross-passages with/without sump, Ramps, two (02) Underground Stations (Nadra Bus Stand and Bhopal Railway Station) including Architectural finishing, Water Supply, Sanitary Installation and Drainage works in entire Underground Section from chainage 28+375 to 31+765 for Bhopal Metro Rail Project.

Authority Under Whom Executed
Kalpataru Projects International Ltd
6th floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz, (E),Mumbai-400055

Time Taken: 2 Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

3. AGCC-06 (Pre-Tender): Geotechnical Investigation work for proposed construction of elevated viaduct and 07 Nos. elevated stations (viz. Agra Cantt, Sadar Bazar, Pratap Pura, Collectorate, Agra College, Hariparvat chauraha and Sanjay Place metro stations) including Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures of Corridor-2 of Agra Metro at Agra, Uttar Pradesh, India.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
AGCC-06 (Pre-Tender): Geotechnical Investigation work for proposed construction of elevated viaduct and 07 Nos. elevated stations (viz. Agra Cantt, Sadar Bazar, Pratap Pura, Collectorate, Agra College, Hariparvat chauraha and Sanjay Place metro stations) including Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures of Corridor-2 of Agra Metro at Agra, Uttar Pradesh, India.

Authority Under Whom Executed
Kalpataru Projects International Ltd
6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai-400055

Time Taken: 2 Month

Remarks: All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

Running Project

1. Geotechnical Investigation (Pre-Tender) work for proposed Construction of Haryana orbital rail corridor connecting palwal to sonipat bypassing delhi area by linking asaoti-patli-sultanpur-asaudah by new electrified BG double line on EPC Mode.

Project Type: Sub-Soil Investigation

Authority Under Whom Executed
Kalpataru Projects International Limited
6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai-400055

Value Of Work:

Date of Assign the Contract: 08.12.2023

Completion Date: 07.02.2024

2. KNPCC-11 UG: Geotechnical Investigation work Design and construction of TBM Tunnel, Cut & Cover Tunnel, ramp after Double Pulia, ramps in Agriculture Depot and depot connections and three underground stations (viz. Rawatpur, Kakadeo and Double Pulia) including architectural finishes.

Project Type: Sub-Soil Investigation

Authority Under Whom Executed
Kalpataru Projects International Limited
6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai-400055

Value Of Work:

Date of Assign the Contract: 30.12.2023

Completion Date: 29.02.2024