1.
Vertical load testing of test piles in accordance with
IS 2911 (Part IV) including installation of loading
platform by Kentledge/ Reaction augers,
installation of measuring instrument, preparation of pile head, conducting the vertical pile load test and submission of test report but excluding excavation of pit up to the cut-off level of pile and cutting of
cut-off length of pile. complete as per specification.
Initial load test up to 300 tonnes (Test Load 2.5 times the Safe/ design capacity ie. 120T).
Project Type: Sub-Soil Investigation
Authority Under Whom Executed
H.G. Infra Engineering Limited
14,PANCHWATI COLONY,RATANADA,JODHPUR 342001,Rajasthan(India)