Empanelled with MoRTH under
Category IV : GeoTechnical Investigation
Indian Railway
Complete Project

1. Sub soil Investigation for determining bearing capacity and their geo- technical properties of soil of works under Dy. Chief Engineer/ Cons. Northern Railway, Rohtak road, Shakurbasti Delhi.

Project Type: Sub-Soil Investigation

Contract Value: 5,04,630.00

Project Detail
It is proposed project was for ROB across Railway track at Delhi.

Authority Under Whom Executed
Office of Dy. Chief Engineer/ Cons. Northern Rly.
Shakurbasti, Delhi- 56

Time Taken: 1.5 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

2. Providing Planning, designing with Architectural designs, drawing including soil exploration etc. In c/with augmentation of capacity from 150 to 175 Locos in electrical Loco shed at Kanpur of ALD Dvn. Of NC Rly

Project Type: Sub-Soil Investigation

Contract Value: 3,33,852.16

Project Detail
It is proposed project was for 150 to 175 Locos in electrical loco shed.

Authority Under Whom Executed
Dy. Chief Engineering/ Const. North Central Rly,
near Jhakarkati Bus Stand, GT Road Kanpur

Time Taken: 2 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depth.

3. Sub Soil Investigation of ROBs in lieu of L-Xings 9139,141,159,163 and 167) on Ambala-Ludhiana Section.

Project Type: Sub-Soil Investigation

Contract Value: 4,47,117.43

Project Detail
Soil Investigation work for elaborate safe bearing capacity for different type of structures block.

Authority Under Whom Executed
To, Dy. Chief Engineer/Const-II,
Northern Railway, Chandigarh.

Time Taken: 1 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Conducting Plate Load test on 750x750mm size of test plate at 2.0M depth.

4. Providing Architectural & Structural consultancy service including soil investigation etc. And associate horticulture for augmentation of Electric Training Centre.

Project Type: Architecture & Structural Designs

Contract Value: 5,09,804.00

Project Detail
For improvement of training facility of division.

Authority Under Whom Executed
Deputy Chief Engineer (Const.)
North Centre Railway, Div. Kanpur

Time Taken: 2 Year

Remarks: Preparation and submission of detail working drawings for Architectural and Structural including conducting sub soil exploration to evaluate safe bearing capacity of sub soil for proposed structure. Providing drawing for service ie. Electrical, sanitation, storm water collection & disposal as per requirement of project.

5. Sub Soil Investigation, Plate Load Test, design and drawing of bridge for Road over Bridge in lieu of Level crossing Nos. 5-C, 11-C & 16-C on Meerut Khurja section & for 45 numbers Road Under Bridge on Meerut Khurja section.

Project Type: Sub-Soil Investigation

Contract Value: 8,90,551.00

Project Detail
Sub Soil Investigation, Plate Load Test, design and drawing of bridge for Road over Bridge in lieu of Level crossing Nos. 5-C, 11-C & 16-C on Meerut Khurja section & for 45 numbers Road Under Bridge on Meerut Khurja section.

Authority Under Whom Executed
To, Dy. Chief Engineer/Const, NDWCS, Northern Railway, New Delhi.

Time Taken: 6 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. design and drawing of bridge for Road over Bridge in lieu of Level crossing Nos. 5-C, 11-C & 16-C on Meerut Khurja section & for 45 numbers Road Under Bridge on Meerut Khurja section.

6. Geotechnical investigation and other ancillary works in connection with doubling of track from Rajpura to Bathinda in Northern Railway.

Project Type: Sub-Soil Investigation

Contract Value: 73,65,389.53

Project Detail
Geotechnical investigation and other ancillary works in connection with doubling of track from Rajpura to Bathinda in Northern Railway.

Authority Under Whom Executed
To, Dy. Chief Engineer/Const.,
Northern Railway, Ambala Cantt.

Time Taken: 6 Month

Remarks:All field activities, conducting SPT collection of DS & UDS including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

7. Conducting geotechnical explorations for the locations of bridges, LHS, deep cutting etc. between km 979 to 1063 for 3rd line between Bina-Katni section

Project Type: Sub-Soil Investigation

Contract Value: 25,04,686.00

Project Detail
Conducting geotechnical explorations for the locations of bridges, LHS, deep cutting etc. between km 979 to 1063 for 3rd line between Bina-Katni section

Authority Under Whom Executed
To, Dy. Chief Engineer-II (Const)
Construction Complex, Habibganj Station (East) West Central Railway, Bhopal-462024

Time Taken: 4 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Plate Load Tests, Vane shear Tests, CBR Test.

8. soil investigation with bore logs, soil testing etc. for construction of ROB’s in lieu of LC No.42/B/Spl at Km.365/11-13 between JPL-HDN in BD section under AEN/JPL.

Project Type: Sub-Soil Investigation

Contract Value: 2,92,252.00

Project Detail
soil investigation with bore logs, soil testing etc. for construction of ROB’s in lieu of LC No.42/B/Spl at Km.365/11-13 between JPL-HDN in BD section under AEN/JPL.

Authority Under Whom Executed
To, Divisional Engineer (III)
East Central Railway, Mughalsarai.

Time Taken: 3 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths. Plate Load Tests.

9. Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway,

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Authority Under Whom Executed
To, The Deputy Chief Engineer (Const) I,
Western Railway, Indore 452001

Time Taken: 6 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

10. Geotechnical Investigation for different location of Railway Major Bridges, RUB, ROB and Deep Cutting etc. Between CH: 0 KM To 73 KM (Satna To Panna Section) of Lalitpur Singarauli New BG Rail Line Project.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical Investigation for different location of Railway Major Bridges, RUB, ROB and Deep Cutting etc. Between CH: 0 KM To 73 KM (Satna To Panna Section) of Lalitpur Singarauli New BG Rail Line Project.

Authority Under Whom Executed
To, Dy. Chief Engineer-III (Construction),
West Central Railway, Construction Complex, Habibganj Station (East), Bhopal-462024

Time Taken: 6 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

11. Soil Investigation in connection with Chandil - Burnpur 3rd Line Project.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil Investigation in connection with Chandil - Burnpur 3rd Line Project.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

12. Soil Investigation between Kandra to Chandil for 3rd Line Work.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil Investigation between Kandra to Chandil for 3rd Line Work.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

13. Soil investigation between Adra-Snaka-Rukni for doubling work.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil investigation between Adra-Snaka-Rukni for doubling work.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

14. Soil Investigation between Joychandipahar to Sanka for doubling work.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil Investigation between Joychandipahar to Sanka for doubling work.

Authority Under Whom Executed
Chief Engineer (Con)-II,
South Eastern Railway, Kolkata-700043

Time Taken: 8 Month

Remarks:Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

15. Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Authority Under Whom Executed
Deputy Chief Engineer (Const) IV
Western Railway, Indore 452001

Time Taken: 12 Month

Remarks: Drilling of NX/NQ size borehole in all types of rock and boulder strata including lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

16. Drafting of ESP's Profile sketches, GA Plans and other drawing in auto cad for various works under Jurisdiction of DY.CE/C/CNB unit.

Project Type: Architecture & Structural Designs

Contract Value:

Project Detail
Drafting of ESP's Profile sketches, GA Plans and other drawing in auto cad for various works under Jurisdiction of DY.CE/C/CNB unit.

Authority Under Whom Executed
North Central Railway Kanpur
Dy. Chief Engineer/Const. Near Jhakarkati Bus Stand, G.T Road Kanpur

Time Taken:

Remarks:Drafting of ESP's Profile sketches, GA Plans and other drawing in auto cad for various works under Jurisdiction of DY.CE/C/CNB unit.

17. Geotechnical investigation & soil exploration for Major bridges, ROBs and Soil testing of sub-base of formation and minor bridges between kms 20.15 to 88.75kms in Govindgarh-Sidhi section in connection with Rewa-Sidhi new B.G. Rail line project.

Project Type: Sub-Soil Investigation

Contract Value:

Project Detail
Geotechnical investigation & soil exploration for Major bridges, ROBs and Soil testing of sub-base of formation and minor bridges between kms 20.15 to 88.75kms in Govindgarh-Sidhi section in connection with Rewa-Sidhi new B.G. Rail line project.

Authority Under Whom Executed
DYCE-C-I-JBP ENGINEERING
2nd floor, DRM office, Jabalpur, 482001

Time Taken: 12 Month

Remarks:All field activities as per BOQ, lab test and submission of test report along with recommendation for safe bearing capacity at various depths.

Clients