Sub-soil Investigation » Major Running Projects

1. Rate Contract for Three Year for Carrying out Soil Investigation/Geotechnical Investigation, Topographical and Contour Surveying works at different location including ROs and KSKs Under UPSO-1

Authority Under Whom Executed
The GM (Engg)
Indian Oil Corporation Limited, Uttar Pradesh State office, Indian Oil Bhawan, TC-39V, Vibhuti Khand, Gomti Nagar, Lucknow.

Date of Assign the Contract: 02.02.2018

Completion Date: 01.02.2020

2. Conducting of Preliminary Survey and Preparation of Land Plan & Land Schedule making Pillars for Construction of Necessary Railway Infrastructure for Proposed transportation of coal by WBPDCL o its Power Plants to be mined from Panchwara (North), Jharkhand.

Authority Under Whom Executed
The General Manager (Projects)
RITES Limited, Regional Project office, 56, C.R. Avenue, 2nd Floor, Kolkata-700012

Date of Assign the Contract: 09.04.2018

Completion Date: 30.01.2020

3. Soil Investigation, Electrical Resistivity Test & CBR Test for proposed 100 MW Solar Power Plant (Phase-III) at Saharanpur, UP.

Authority Under Whom Executed
Rays Power Infra Pvt. Ltd.
320, 3rd Floor, Murli Bhawan, Ashok Marg, Lucknow.

Date of Assign the Contract: 27.02.2019

Completion Date: 27.04.2020

4. Contract KNPCC-02 (R1): Geotechnical Investigation work for proposed construction of elevated viaduct and 9 Nos. elevated station including special span on Priority Section of Corridor-1, Phase-I, of Kanpur Metro at Kanpur.

Authority Under Whom Executed
Project Manager
Afcons Infrastructure Ltd, Afcons House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053

Date of Assign the Contract: 20.02.2020

Completion Date: 20.05.2020

5. Geotechnical Investigation for widening and reconstruction of existing intermediate to 2 lane with paved shoulder configuration from existing Km. 268.00 to Km 300.00 of NH-58 (Kaudiyala to Devprayag Road) in the state of Uttarakhand.

Authority Under Whom Executed
ESPAN Infrastructure (I) Ltd
B-7, Sector-36, Noida. B-405, Nirman Vihar, Delhi.

Date of Assign the Contract: 31.01.2019

Completion Date: 30.04.2020

6. Soil investigation for minor & major bridges between Indore-Ujjain section in connection with Indore-Dewas- Ujjain doubling project of Western Railway.

Authority Under Whom Executed
Deputy Chief Engineer (Const) IV
Western Railway, Indore 452001

Date of Assign the Contract: 24.01.2020

Completion Date: 23.07.2020

7. Geotechnical Investigation work for Preparation of DPR of Delhi-Ludhiana –Amritsar –Karta Expressway having an approximate length of 600 km.

Authority Under Whom Executed
Feedback Infra Pvt. Ltd.
15th Floor, Building 9B, DLF Cyber City, Phase 3, Gurugram - 122 002, India

Date of Assign the Contract: 08.04.2020

Completion Date: 07.06.2020