1.
Rate Contract for Three Year for Carrying out Soil Investigation/Geotechnical Investigation, Topographical and Contour Surveying works at different location including ROs and KSKs Under UPSO-1
Authority Under Whom Executed
The GM (Engg)
Indian Oil Corporation Limited,
Uttar Pradesh State office,
Indian Oil Bhawan, TC-39V, Vibhuti Khand, Gomti Nagar, Lucknow.
Date of Assign the Contract: 02.02.2018
Completion Date: 01.02.2021
2.
Geotechnical Investigation work Phase-II for Preparation of DPR of Delhi-Ludhiana –Amritsar –Karta
Expressway having an approximate length of 600 km.
Authority Under Whom Executed
Feedback Infra Pvt. Ltd.
15th Floor, Building 9B,
DLF Cyber City, Phase 3,
Gurugram - 122 002, India
Date of Assign the Contract: 31.08.2020
Completion Date: 30.12.2021
3.
Geotechnical Investigation work for the Proposed Metro Alignment from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (via. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj)
Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053
Date of Assign the Contract: 03.09.2020
Completion Date: 02.01.2021
4.
Ground Penetrating Radar Surveys for Proposed Metro Alignment from IIT Kanpur Station to Motijheel Station.
Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053
Date of Assign the Contract: 07.11.2020
Completion Date: 07.12.2020
5.
Geotechnical Investigation work for the proposed Metrolite Corridor from Kirti Nagar to Bamnoli Village including Depot of DMRC LRTS Project.
Authority Under Whom Executed
Project Manager-10B
Delhi Metro Rail Corporation Ltd.
Opp. Inderlok Metro Station, Shahzada Bagh, New Delhi.
Date of Assign the Contract: 24.08.2020
Completion Date: 23.02.2021
6.
Geotechnical Investigation works at different locations in
proposed land for Depot (PAC) of Agra Metro Rail Project for
Uttar Pradesh Metro Rail Corporation Ltd.
Authority Under Whom Executed
Joint Chief Engineer (Civil)
Uttar Pradesh Metro Rail Corporation Ltd.
(Agra Metro Rail Project)
Lucknow
Date of Assign the Contract: 06.10.2020
Completion Date: 05.12.2020
7.
Contract KNPCC-02 (R1): Geotechnical Investigation work Proposed Metro Alignment
from start of elevated ramp (after Juhi) to end of
Naubasta station including Five elevated station (via. Baradevi, Kidwai Nagar, Vasant Vihar, Baudh Nagar, Naubasta).
Authority Under Whom Executed
AFCONS Infrastructure Limited
AFCONS House, 16, Veera Desai Road, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053
Date of Assign the Contract: 03.09.2020
Completion Date: 02.12.2020
8.
Geotechnical Investigation work Inside of IOCL Barauni for Proposed 220 KV Switch Yard at
IOCL, Barauni.
Authority Under Whom Executed
ABB Power Products & Systems India Ltd.
BIPL,Omega Building,13th Floor(Wing-North),
Block-EP & GP,Salt Lake,Sector-V,
Kolkata-700091,WB,India
Date of Assign the Contract: 21.09.2020
Completion Date: 20.12.2020