Geotechnical Investigation work for proposed Design and Construction of Twin Tunnel by Shield TBM, Underground Station (Ramganj Chaupar), Cut & Cover Tunnel Box and Underground Ramp from Badi Chaupar Dead end Ch.:10387.860 to Underground Ramp end Ch.:13040 of Jaipur Metro Phase -1C Including Entry Exit Structures, Architectural Finishing, Water Supply, Sanitary Installations and drainage Works at Jaipur, Rajasthan, India
View Now
Geotechnical Investigation (Pre-Tender) work for proposed Construction of Haryana orbital rail corridor connecting palwal to sonipat bypassing delhi area by linking asaoti-patli-sultanpur-asaudah by new electrified BG double line on EPC Mode.
View Now
TAM grouting at Chunniganj metro station, Kanpur, U.P.
View Now
Geotechnical Investigation work for Proposed Multi Modal Logistics Park (MMLP) Indore near Pithampur, in Dhar District in the State of Madhya Pradesh by National Highway Logistics Management Limited.
View Now
Vertical load testing of test piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/ Reaction augers, installation of measuring instrument, preparation of pile head, conducting the vertical pile load test and submission of test report but excluding excavation of pit up to the cut-off level of pile and cutting of cut-off length of pile. complete as per specification. Initial load test up to 300 tonnes (Test Load 2.5 times the Safe/ design capacity ie. 120T).
View Now
Geotechnical Investigation, Preparation of Geotechnical Report for designing of foundations for HORC Viaduct between Sohana & Dhulawat stations of Orbital Rail Corridor (HORC) Project in the State of Haryana.
View Now
KNPCC-11 UG: Geotechnical Investigation work Design and construction of TBM Tunnel, Cut & Cover Tunnel, ramp after Double Pulia, ramps in Agriculture Depot and depot connections and three underground stations (viz. Rawatpur, Kakadeo and Double Pulia) including architectural finishes.
View Now