Project Detail
EWS Housing project under JNNRUM on design built bases.
Authority Under Whom Executed
Gahoi Buildwell Ltd.
701, Marcantile house, 15, - 110 001 Ph. 91-11-2370 6183
Time Taken: 3 Year
Remarks:Providing services for Architectural, structural design, Electrical, Water supply, sewerage, Fire fighting, storm water drainage, water harvesting and Horticulture for proper completion of project.
Project Detail
For improvement of training facility of division.
Authority Under Whom Executed
Deputy Chief Engineer (Const.)
North Centre Railway, Div. Kanpur
Time Taken: 2 Year
Remarks: Preparation and submission of detail working drawings for Architectural and Structural including conducting sub soil exploration to evaluate safe bearing capacity of sub soil for proposed structure. Providing drawing for service ie. Electrical, sanitation, storm water collection & disposal as per requirement of project.
Project Detail
RCC Framed building
Authority Under Whom Executed
Life Insurance Corporation of India
Engineering department 25, K.G. Marg, 110 001
Time Taken: 1 Month
Remarks:Preparation & Submission of detailed Architectural & Structural design/ drawings including interior layout plan in line.
Project Detail
Group Housing Project
Authority Under Whom Executed
Marg Ltd.
3rd. Floor, 6, Pusa road, 110 005 Ph. 011-45173500
Time Taken: 2 Month
Remarks:Preparation of designs, drawings all the finishes (civil / structural works), approvals of respective designs / drawings.
Project Detail
Consultancy fee Rs.73,100.00
Authority Under Whom Executed
Executive Engineer Building Project Division
M- 241 Lok Nayak Setu, Western Bank ITO Bridge, .
Time Taken: 15 Days
Remarks:Preparation & Submission of detailed Structural design/ drawings including interior layout.
Project Detail
Industrial Shed in structural steel
Authority Under Whom Executed
Power Machines (India) Ltd.
B-21, Sector- 58, Noida- 201 301, Utter Pradesh Ph. +91- 120- 4036001- 04
Time Taken: 25 Days
Remarks:Preparation of Architectural & Structural design/ drawings including service drawings for construction of store building.
Project Detail
Hostel & Staff residence
Authority Under Whom Executed
Rama Medical College
Mandhana, Kanpur. Rama City, G.T. Road, Mandhana, Kanpur- 209 217(U.P.) Ph. +91-512-2780882-83-84-85-86.
Time Taken: 2 Year
Remarks:Preparation of Architectural & Structural design/ drawings including service drawings for construction of store building.
Project Detail
G+2 floor RCC frame structure building
Authority Under Whom Executed
Gausia Aurvedic Medical College, Fatehpur.
Time Taken: 3 Month
Remarks:Preparation of Structural design/ drawings including service drawings for construction of store building.
Project Detail
Consultancy fee @ 3.0% of Project cost.
Authority Under Whom Executed
Jagatguru Ram Bhadracharya Handicapped University at Chritrakoot, U.P.
Time Taken: 6 Month
Remarks:Preparation of Architectural and structural design/ drawings including service drawings for sanitation, Electrical, Plumbing etc. For proposed construction of Hostel Block-II at University Campus.
Project Detail
Fee Rs.4.0 per Sqft.
Authority Under Whom Executed
LIC of India, Engineering Dept.
Central Zonal Office, 2nd; Floor Jivan Shikha 60-B, Hosangabad Road P.B.28, Bhopal-462011
Time Taken: 20 Days
Remarks:Preparation of preliminary structural design and drawings along with sketch design, furnishing design calculation & getting approval from LIC including liaising all concerns, for proposed DO/BO, Investment building cum Guest house at BIlaspur.
Project Detail
Fee 1,60,000
Authority Under Whom Executed
LIC of India
Divisional office, Bhawani Singh road, Jaipur.
Time Taken: 30 Days
Remarks:Consultancy service for proposed construction of branch office building at bhawani mandi.
Project Detail
Fee 3,65,840
Authority Under Whom Executed
LIC of India, Engineering Dept.
Central Zonal Office, 2nd; Floor Jivan Shikha 60-B, Hosangabad Road P.B.28, Bhopal-462011
Time Taken: 30 Days
Remarks:RCC frame analysis considering seismic parameter and preparation of working design/ drawings for proper completion of project.
Project Detail
Consultancy fee @ 1.0% of Project cost.
Authority Under Whom Executed
Shri Lakshmi Cotsyn Ltd.
C- 40, Sector 57, Gautam Budh Nagar, NOIDA (U.P.) Tel.: 0120-4722700 Fax: 0120- 4722722
Time Taken: 1.5 Year
Remarks:Providing services for Architectural, structural design, Electrical, Water supply, sewerage, Fire fighting, storm water drainage, water harvesting and Horticulture for proper completion of project.
Project Detail
Consultancy fee @ 1.5% of Project cost.
Authority Under Whom Executed
Galaxy Real State Developers & Builders Pvt. Ltd.
818, KAN Chambers 14/ 113, Civil Lines Kanpur.
Time Taken: 5 Year
Remarks:Structural Design & drawing services for development of Group Housing (Shivalik Attalika) at Bithoor road, Singhpur Kachhar Kanpur.
Project Detail
300000.00
Authority Under Whom Executed
The Institute of Chartered Accountants of India
post box No. 314, 16/77- B, civil lines Kanpur-208001 Ph. 0512-3989398, 3011152-70
Time Taken: 3 Month
Remarks:Providing structural consultancy serviced for construction of commercial cum Institutional building ie. ICAI Bhawan at Lakhanpur, Kanpur.
Project Detail
1276155.00
Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633
Time Taken: 1 Year
Remarks:Providing Topographical survey, Geo-Technical Investigation & Architectural service for proposed construction of Rural Self Employment Training Institute at Various Locations.
Project Detail
1122345.00
Authority Under Whom Executed
Life Insurance Corporation of India,
Jeevan Prakash, 30 - Hazratganj Lucknow, P.b No. 111 Lucknow-226001 Ph. No. 0522-2628295,2525633
Time Taken: 1 Year
Remarks:Providing Topographical survey, Geo-Technical Investigation & Architectural service for proposed construction of Rural Self Employment Training Institute at Various Locations.
Project Detail
3,33,852.16
Authority Under Whom Executed
North Central Railway Kanpur.
Dy. Chief Engineer/Const. Near Jhakarkati Bus Stand, G.T Road Kanpur
Time Taken: 4 Month
Remarks:Preparation and submission of detail working drawings for Architectural and Structural including conducting sub soil exploration to evaluate safe bearing capacity of sub soil for proposed structure.
Project Detail
Design Analysis of RCC Framed or Load Bearing Structure and Preparation/Submission of Detail Working Drawing for Foundation.
Authority Under Whom Executed
KEC International Limited,
1st Floor, Building No. 9A,
DLF City, Phase-III,
Gurgaon.
Time Taken: 1 Month
Remarks:Design Analysis of RCC Framed or Load Bearing Structure and Preparation/Submission of Detail Working Drawing for Foundation.
Project Detail
Design Consultancy for Factory unit at Gajner Raod, Kanpur Dehat.
Authority Under Whom Executed
Kanpur Plastipack Ltd
D-19,20 Panki Industrial Area, Kanpur
Time Taken: 2.5 Year
Remarks:Design Consultancy for Factory unit at Gajner Raod, Kanpur Dehat.