Architecture & Structural Designs » Major Running Projects

1. Architectural Consultancy services including supervision of construction work of Office building of Bank of Baroda at Faizabad.

Authority Under Whom Executed
General Manager
Bank of Baroda Zonal Office EUP Zone V-23, Vibhuti Khand, Gomti Nagar, Lucknow-226010

Completion Time: 3 Year

2. Design/Consultancy service for civil/Allied Electrical Service for construction of Married Accommodation, Barracks, Guard room, Soil Investigation etc. For DSC Personnel at HAL TAD Kanpur.

Authority Under Whom Executed
Hindustan Aeronautics Ltd.
Transport Aircraft Division,Kanpur-208008

Completion Time: 2 Year

3. Drafting of ESP's Profile sketches, GA Plans and other drawing in auto cad for various works under Jurisdiction of DY.CE/C/CNB unit.

Authority Under Whom Executed
North Central Railway Kanpur
Dy. Chief Engineer/Const. Near Jhakarkati Bus Stand, G.T Road Kanpur

Completion Time: 6 Month

4. Appointment of Architect for the development work of Plot CP -4 at Vasundhara, Ghaziabad.

Authority Under Whom Executed
Life Insurance Corporation of India
Jeevan Prakash16/98 Kanpur.

Completion Time: 3 Year

5. Architectural Consultancy service for construction of R-SETI (BSVS) Building at Village Daud Nagar, Tehsil & Pargana Sadar, Distt. Raebareli.

Authority Under Whom Executed
Asstt. General Manager
Bank of Baroda Zonal Office EUP Zone V-23, Vibhuti Khand, Gomti Nagar, Lucknow-226010

Completion Time: 2 Year

6. Architectural Consultancy service for construction of R-SETI (BSVS) Building at Village Daud Nagar, Tehsil & Pargana Sadar, Distt. Raebareli.

Authority Under Whom Executed
Asstt. General Manager
Bank of Baroda Zonal Office EUP Zone V-23, Vibhuti Khand, Gomti Nagar, Lucknow-226010

Completion Time: 2 Year

7. Project Design consultancy services for Development of LOHIA Park Project in Kanpur.

Authority Under Whom Executed
The Chief Town Planner, Kanpur Development Authority, Kanpur.

Completion Time: 2 Year

8. Architectural Consultancy service for proposed construction of BO & OQ at Ratangarh, under DO Bikaner.

Authority Under Whom Executed
To, Chief Engineer, LIC of India
Engineering department 25, K.G. Marg, New Delhi- 110 001

Completion Time: 3 Month

9. Consultancy Service for Construction of NVS Regional office at Lucknow.

Authority Under Whom Executed
To, Project Director (U.P.)
Telecommunications Consultants India Ltd, LDA Colony, Lucknow.

Completion Time: 2 Year

10. Architectural/ structural Consultant for Construction of various buildings (Factory & Township) at HAL Lucknow.

Authority Under Whom Executed
To, The Chief Manager (TS),
Hindustan Aeronautics Limited, Accessories Division, Lucknow.

Completion Time: 2 Year

11. Providing Consultancy Services for Proposed Multi Storied office Building at Vibhuti Khand Gomtinagar, Lucknow

Authority Under Whom Executed
To The, Superintending Engineer,Civil New Projects,
7th floor, Shakti Bhawan Extn, Lucknow

Date of Assign the Contract: 20.05.2019

Completion Date: 19.05.2021

Completion Time: 2 Year

12. Architect for the Proposed Construction of STC with Hostel Building and Faculty Quarters on Plot No. 1, Sec-6, Ram Ganga Nagar, Bareilly.

Authority Under Whom Executed
To, The Dy. Chief Engineer (I/C),
LIC of India, Engineering Deptt, Jeevan Vikas, 16/275, Civil Line, Kanpur-208001

Completion Time: 1 Year

13. Consultancy Services for Housing of Air-conditioned shop at existing production Hall and water proofing and covering the sheeted areas over the existing nine shell roof (umbrella shaped) structure at HAL (Revamping of existing shop-Mech. Factory)

Authority Under Whom Executed
The DGM (TS)
Accessories Division, Hindustan Aeronautics Limited. Lucknow-226016

Date of Assign the Contract: 15.01.2018

Completion Date: 24.06.2020

Completion Time: 4 Year